dvice
Hot Rolled
- Joined
- Mar 12, 2004
- Location
- dutchess ny
I have programs a few holes and counter bores and figured since I have so many different sizes and they are all one off pieces, that i would generate most of the holes with an endmill, aftr i started them with a standard drill used elsewhere in the program.
so since I want to cut it in several passes, Gibbs programs a sub program that is very short.
on the first hole , the machine stopped after the fourth or fith pass at the ned of the G3 move...I tried it several times and it always stopped at the same spot..
so i moved on and did the three next holes , which were the same basic program! and size!!!
then it happened again on the next larger size hole...got half way through all the stepped increments and just froze at the end of the G3 move....the sub only has these lines:
N1 G3I-.0469J.0421F3
N2G00Z.1
N3M99
thats it..and it will do four or so passes doign that program and then just stop around the end of the g3, before it gets to the G00 z.1!!
the set up move for this sub call is:
N121 G17 G40 G80
N122G0 G57 G90 G94 X-.3281 Y-.4171 S1200 M3
N123G43 Z.025 H3 M8
N124 G1 Z-.0472 F3
N125 M98 P705
N126 G0 Z-.0222
N127 G1 Z-.0944 F3
N128 M98 P705
ECT ECT ECT
ANYONE
hass DEALER WONT CALL ME BACK EVEN AFTER 4 CALLS....
JUST LIKE THE MITUBISHI EDM MACHINE, THEY DONT ANSWER THE PHONE AND THEY TAKE A DAY OR TWO TO CALL BACK.
DAM iD THINK THAT IF SOMEONE COULD COME UP WITH GOOD CUSTOMER SERVICE, THWEY WOULD SELL MACHINES LIKE CRAZY
BOB
so since I want to cut it in several passes, Gibbs programs a sub program that is very short.
on the first hole , the machine stopped after the fourth or fith pass at the ned of the G3 move...I tried it several times and it always stopped at the same spot..
so i moved on and did the three next holes , which were the same basic program! and size!!!
then it happened again on the next larger size hole...got half way through all the stepped increments and just froze at the end of the G3 move....the sub only has these lines:
N1 G3I-.0469J.0421F3
N2G00Z.1
N3M99
thats it..and it will do four or so passes doign that program and then just stop around the end of the g3, before it gets to the G00 z.1!!
the set up move for this sub call is:
N121 G17 G40 G80
N122G0 G57 G90 G94 X-.3281 Y-.4171 S1200 M3
N123G43 Z.025 H3 M8
N124 G1 Z-.0472 F3
N125 M98 P705
N126 G0 Z-.0222
N127 G1 Z-.0944 F3
N128 M98 P705
ECT ECT ECT
ANYONE
hass DEALER WONT CALL ME BACK EVEN AFTER 4 CALLS....
JUST LIKE THE MITUBISHI EDM MACHINE, THEY DONT ANSWER THE PHONE AND THEY TAKE A DAY OR TWO TO CALL BACK.
DAM iD THINK THAT IF SOMEONE COULD COME UP WITH GOOD CUSTOMER SERVICE, THWEY WOULD SELL MACHINES LIKE CRAZY
BOB