llf264
Cast Iron
- Joined
- May 18, 2006
- Location
- Ft. Worth, TX
Hi guys, after getting two 2000 SH503 's set on the production floor we fired them up and replaced the batteries. They have the MSG panel on them and I am getting "PC Alarm EX1257 PowerMate" and "NC alarms 300: APC Need ZRN for [insert each axis name here: x,y,z,B]". Also in the cabinet, our Power Mate pendant shows alarm 310 316. Anyone have a manual .pdf for this machine or a commissioning sequence? I think I need to know the ref distances for each axis and where to measure from as well as any sequences for OT releases if required.
Even just a list of alarm codes for the 2000 year fanuc/msg machine would be a helping start.
P CAN took me to a wacky set of options so I restarted to the native Mori Seiki screen and I don't know which order I have to clear the alarms or how to release the freehold other than hold the freehold button while switching the panel edit button back and forth until the freehold led blinks continuously. Is that the right thing then I have to do something else to allow the handwheel to work?
Any help would be greatly appreciated.
Even just a list of alarm codes for the 2000 year fanuc/msg machine would be a helping start.
P CAN took me to a wacky set of options so I restarted to the native Mori Seiki screen and I don't know which order I have to clear the alarms or how to release the freehold other than hold the freehold button while switching the panel edit button back and forth until the freehold led blinks continuously. Is that the right thing then I have to do something else to allow the handwheel to work?
Any help would be greatly appreciated.