keurb
Plastic
- Joined
- Dec 10, 2014
- Location
- Rockford, MI
I've only ever ran one EDM drill ever and I'm curious as to how efficient it is.
So my question is how long (on average) should this take with the correct settings?
1.5 mm hole through 2" of hardened 420 SS (50-54 RC)
Takes me on average about 30 minutes
So my question is how long (on average) should this take with the correct settings?
1.5 mm hole through 2" of hardened 420 SS (50-54 RC)
Takes me on average about 30 minutes
Last edited: