MV2400 new mahcine
Close
Login to Your Account
Results 1 to 11 of 11
  1. #1
    Join Date
    Feb 2012
    Location
    central, USA
    Posts
    188
    Post Thanks / Like
    Likes (Given)
    2
    Likes (Received)
    28

    Default MV2400 new mahcine

    Looking at getting a Mits MV2400 wire edm, we currently run a Mits FX10k. I know the technology will be much different, but is there anything worth noting? We are going to purchase the MV2400, so as little down time as possible will be nice if anyone can help me out. Its my understanding that the machine is conversational and can be programmed at the machine.

    We are going to switch from running .010 to .012. Hopefully this will be a good thing. We do a lot of rough cutting or rough cutting with 1-2 skims. We also do 3 skims too but maybe not quite as often.

    I'm excited to get something where I can cut on it, shut it down and then come back the next day and start right up again. The previous machine didn't have a cooler, so stopping had to be planned in a certain place.

    Going to dabble in the rails/fixturing world on this edm, so that will be new to me also. I hope we can find a way to make everything we cut work.

  2. #2
    Join Date
    Oct 2001
    Location
    MI
    Posts
    166
    Post Thanks / Like
    Likes (Given)
    69
    Likes (Received)
    68

    Default

    Quote Originally Posted by Bradracer18 View Post
    Looking at getting a Mits MV2400 wire edm, we currently run a Mits FX10k. I know the technology will be much different, but is there anything worth noting? We are going to purchase the MV2400, so as little down time as possible will be nice if anyone can help me out. Its my understanding that the machine is conversational and can be programmed at the machine.

    We are going to switch from running .010 to .012. Hopefully this will be a good thing. We do a lot of rough cutting or rough cutting with 1-2 skims. We also do 3 skims too but maybe not quite as often.

    I'm excited to get something where I can cut on it, shut it down and then come back the next day and start right up again. The previous machine didn't have a cooler, so stopping had to be planned in a certain place.

    Going to dabble in the rails/fixturing world on this edm, so that will be new to me also. I hope we can find a way to make everything we cut work.
    Bradracer
    We have had experience with most of the series of Mits machines (G, H, H1, HA, RA, FX, FA, FA Advance and now have 2 FA10s, 2 FA20 Advance, 2 MV2400R, and 1 MV4800.

    While the MV machine does have conversational programming, I wouldn't be expecting to use it for your primary source of programming. After playing with it for a day or so, we decided to just use our offline programming instead. You should probably expect to use the software that you have currently. The same program should run with a few minor changes. You can have Mits help you with a "swap" program. It has been a while since the FX machines but I don't think there is a lot of differences. Epaks and feedrates will be different for sure.

    I would start out with the .010 wire to begin with unless you cut a lot of thick (4" and thicker) stuff. The machine comes with .010 guides.

    The best thing you can do, in my opinion, is to learn how to do multiple workpiece setups in the machine. These machines have very reliable threaders and can run through the night with the "lights out". In the morning, pull the slugs and let it do the skims. Get ready to fill it up for the following afternoon and night. Program your pieces with this process in mind.

    Depending on your workpiece size, rails and fixtures can make a real difference especially if you continually cut the same thing. We are a job shop. We generally don't cut more than one of a kind pieces. All that expensive fixturing doesn't help us that much.

  3. #3
    Join Date
    Feb 2012
    Location
    central, USA
    Posts
    188
    Post Thanks / Like
    Likes (Given)
    2
    Likes (Received)
    28

    Default

    We are also a job shop, 1-2 parts usually or maybe a handfull at a time. We are going to buy a rail system to start out, its made by ram precision tooling.

    Does the MV series have the capability to "find" a part if you tell it approx. where it is? We locate a lot of parts with .250 or .500 reamed holes, if I were to "estimate" the center of 2-3 parts could my programming make the machine find each part when its ready to cut it?

    We want to run lights out, it will be a new ball game. Currently we cant cut anything from day to day because without a chiller the machine moves too much. I'll have to change my programming mindset to doing all rough cuts then all the skims so we have a longer run time.

  4. #4
    Join Date
    Oct 2001
    Location
    MI
    Posts
    166
    Post Thanks / Like
    Likes (Given)
    69
    Likes (Received)
    68

    Default

    Quote Originally Posted by Bradracer18 View Post
    We are also a job shop, 1-2 parts usually or maybe a handfull at a time. We are going to buy a rail system to start out, its made by ram precision tooling.

    Does the MV series have the capability to "find" a part if you tell it approx. where it is? We locate a lot of parts with .250 or .500 reamed holes, if I were to "estimate" the center of 2-3 parts could my programming make the machine find each part when its ready to cut it?

    We want to run lights out, it will be a new ball game. Currently we cant cut anything from day to day because without a chiller the machine moves too much. I'll have to change my programming mindset to doing all rough cuts then all the skims so we have a longer run time.
    You could probably program the machine to do a center find and "find" the part. I think an easier solution is to use a "MOVE" program. First, you would place each workpiece in the machine and indicate them ( or figure out their angle in the machine. Then center find the starting point of each and G54, G55, G56, G57, etc.. them. Use a move program to go to G54 and run program # 1 with an angle that was pre-measured. Then go to G55 and run program # 2 with the pre-measured angle and so on.....

    I could pm you our "MOVE" program if needed or post it here.

    What programming system do you have? You could use your current program while using a micro joint to hang onto the slugs. The more you can customize your post processor to your needs the better you will run parts overnight. Where are you located in the "central USA"? We could possibly show you a few tricks if you came to Michigan.

  5. Likes msrbl liked this post
  6. #5
    Join Date
    Jun 2016
    Country
    HUNGARY
    Posts
    17
    Post Thanks / Like
    Likes (Given)
    28
    Likes (Received)
    4

    Default

    I would be interested in the "move" program as well.
    To be honest, I am interested in the whole subprogram system.
    If you could post or send me an example it would be greatly appreciated.
    Thing is, I never got any training with the MV2400 and everything I know, I figured myself, but I only found mentions of using subprograms, but an actual example of some sort.
    If it is not too much to ask I'd love to see a full program structure, that includes subprogram(s).
    I only have a brief idea of how it works and an example would enlighten me. At least I hope. ahaha

    Thanks a lot,
    Mate

  7. #6
    Join Date
    Dec 2015
    Country
    UNITED STATES
    State/Province
    Ohio
    Posts
    37
    Post Thanks / Like
    Likes (Given)
    12
    Likes (Received)
    12

    Default

    Quote Originally Posted by msrbl View Post
    I would be interested in the "move" program as well.
    To be honest, I am interested in the whole subprogram system.
    If you could post or send me an example it would be greatly appreciated.
    Thing is, I never got any training with the MV2400 and everything I know, I figured myself, but I only found mentions of using subprograms, but an actual example of some sort.
    If it is not too much to ask I'd love to see a full program structure, that includes subprogram(s).
    I only have a brief idea of how it works and an example would enlighten me. At least I hope. ahaha

    Thanks a lot,
    Mate
    I do mine like this on the mits mv machines.

    (the following will be program L100)

    %
    G53 G92 G90 x0y0
    G00 G54 x0y0

    G22 L(xxx <--program #you want to run)

    M58
    M121
    M02
    %


    Keep in mind your program to run the part last line must be changed from M02 to G23.
    From there you can copy & paste the exaple to add additional work points, but you always have to have the "G53 G92 X0Y0" and the "G00 G54,55,56 x0y0)

  8. Likes msrbl liked this post
  9. #7
    Join Date
    Feb 2012
    Location
    central, USA
    Posts
    188
    Post Thanks / Like
    Likes (Given)
    2
    Likes (Received)
    28

    Default

    Thanks for all of the help, especially the program! We are currently using CamWorks. I haven't used anything else, but I don't consider it super Wire EDM friendly. I'm not near Michigan or I'd take you up on your offer, but thank you!

    We had them trade out the .010 guides for .012. We quite often cut over 4", and will likely be cutting up to 11-12" occasionally too. I'd say a 7-9" cut will happen a few times a month. These are the type of cuts I'm excited to let run over night or the weekend. I'm hoping the machine can auto-shutdown.

    We are looking into a software called something 360, can't remember for sure the name but it allows you to see the progress of the machining from your phone. It also sends emails/texts of errors, etc. Might be handy.

  10. #8
    Join Date
    Oct 2001
    Location
    MI
    Posts
    166
    Post Thanks / Like
    Likes (Given)
    69
    Likes (Received)
    68

    Default

    Quote Originally Posted by Bradracer18 View Post
    Thanks for all of the help, especially the program! We are currently using CamWorks. I haven't used anything else, but I don't consider it super Wire EDM friendly. I'm not near Michigan or I'd take you up on your offer, but thank you!

    We had them trade out the .010 guides for .012. We quite often cut over 4", and will likely be cutting up to 11-12" occasionally too. I'd say a 7-9" cut will happen a few times a month. These are the type of cuts I'm excited to let run over night or the weekend. I'm hoping the machine can auto-shutdown.

    We are looking into a software called something 360, can't remember for sure the name but it allows you to see the progress of the machining from your phone. It also sends emails/texts of errors, etc. Might be handy.
    Bradracer
    Not sure what you want in a "auto-shutdown". Obviously, it will stop at an M01 or M02 and wait for you to restart. This machine will easily run with the lights out.

    We have 5 of our machines hooked up to the Remote360 system. I can watch the display of the machines on my laptop right now if I want. It works well for us. Have them include the service for a year or two in the purchase of the machine. You'll like it.

    I still need to post our MOVE program.

    Here is a screenshot attempt. It shows 4 die steels that are set up in the 4 corners of the machine. This has been running since 3:00 pm yesterday.
    mitsscreen.jpg

  11. #9
    Join Date
    Feb 2012
    Location
    central, USA
    Posts
    188
    Post Thanks / Like
    Likes (Given)
    2
    Likes (Received)
    28

    Default

    Awesome I hope to take advantage of the remote360! Looks neat by your screen shot!

    The autoshut down I was talking about, I was hoping like on a weekend if I had say only 5 hrs to cut after friday afternoon, that the machine would shutdown after this was cut, as to not run and burn electricity all weekend after the 5 hr cut. Not a big deal, but I forsee us cutting things that might cut from 4pm to midnight quite often, then the machine will set idle until 6am.

  12. #10
    Join Date
    Dec 2015
    Country
    UNITED STATES
    State/Province
    Ohio
    Posts
    37
    Post Thanks / Like
    Likes (Given)
    12
    Likes (Received)
    12

    Default

    Quote Originally Posted by Bradracer18 View Post
    Awesome I hope to take advantage of the remote360! Looks neat by your screen shot!

    The autoshut down I was talking about, I was hoping like on a weekend if I had say only 5 hrs to cut after friday afternoon, that the machine would shutdown after this was cut, as to not run and burn electricity all weekend after the 5 hr cut. Not a big deal, but I forsee us cutting things that might cut from 4pm to midnight quite often, then the machine will set idle until 6am.
    Just so you know.. that software is not required to view the screen remotely. Our IT dept. has our BAs,FAs & MV's all hooked up. If you are cheap and have some networking experience I'm sure its not all that difficult...or maybe it is?

  13. #11
    Join Date
    Nov 2015
    Country
    UNITED STATES
    State/Province
    Florida
    Posts
    32
    Post Thanks / Like
    Likes (Given)
    0
    Likes (Received)
    6

    Default

    Once you have the MV2400 connected to your company network, you can see the screen remotely by going to the following address:

    http://<ip_address>/index_e.html

    Replace <ip_address> with the IP of your machine. I can't remember if this page allows you to control the machine, or if it's for viewing only.

    I am not sure if there is a way to auto shutdown the machine, but I believe there may be some power save options in the maintenance maker screen (or even normal maintenance options).

    Press "Maint" button, then hold control + shift and right click with mouse on "Machine Parameters", then click "Maintenance Maker". After that, peruse around the different menus to find anything power-save related. Going off the top of my head, so some of the buttons may be named differently.

    DISCLAIMER: Be very careful around these menus, take care to not change anything you shouldn't be. Anything you change is your responsibility.

    In my experience, weird things tend to happen when CNC machines are sent through regular power cycles. Things stop working, new error messages on bootup, I've seen it all. I think you would be better suited to find any kind of power save features that keep the control powered up, but shuts off other idle parts of the machine.