MV2400 new mahcine - Page 2
Close
Login to Your Account
Page 2 of 2 FirstFirst 12
Results 21 to 22 of 22
  1. #21
    Join Date
    Dec 2015
    Country
    UNITED STATES
    State/Province
    Ohio
    Posts
    43
    Post Thanks / Like
    Likes (Given)
    13
    Likes (Received)
    14

    Default

    Quote Originally Posted by msrbl View Post
    I don't even use that feature.
    If you pull a spool and replace it with an other one, when pressing the pre tension switch to turn pt back on there is the same dialogue box popping up like if you were going to the maintenance screen and pressing on 'wire type'.
    Our work flow does not allow proper planning anyway, as 6-8 pieces count as a series for me, nor do I run huge molds overnight.
    If I have to leave the machine unattended, I just 'eyeball' how much wire I would need and decide if I change the spool or not.
    tl;dr
    If you don't need to pay close attention on how much wire you have on the spool, don't worry about the maintenance screen. I even disabled the warning (there is a checkbox after wire consumption).
    YES! Keep that warning off..I can not stand that constant blinking.

  2. #22
    Join Date
    Feb 2012
    Location
    central, USA
    Posts
    193
    Post Thanks / Like
    Likes (Given)
    2
    Likes (Received)
    29

    Default

    Still getting used to the machine, but pretty familiar with it. I had to use the mirror function the other day, I generally don't use this as I'm kinda crazy and like to cam my parts in the fashion which they are put on the table. Anyways, I see in 20 years they still haven't figured out how to make the screen read the proper G41/G42 on the mirror function so the operator doesn't crap his pants. I was pretty concerned but it worked.

    Do any of you guys use the scheduler function of this machine?


Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •