klemchuk
Aluminum
- Joined
- Dec 30, 2004
- Location
- Surrey, B. C.
HI all;
I have a TM2P running a part with a cycle time of 1 hour 11 minutes and 31 seconds in the normal machine mode.
When I turn on high speed machining the cycle time increase by 30 seconds. This just seems wrong. Anyone have any ideas?
Thankss.
I have a TM2P running a part with a cycle time of 1 hour 11 minutes and 31 seconds in the normal machine mode.
When I turn on high speed machining the cycle time increase by 30 seconds. This just seems wrong. Anyone have any ideas?
Thankss.