I am considering installing 2 of these. Harrington HPC500 Medium Duty Class B Cranes, 1 ton kits. These kits have the end trucks and bridge complete. Just need long runners and hoist with hoist trolley. It just seems to make sense for the $ involved. These are not powered in either direction. 2 of the 1 ton units in 12 foot will do more than I need but I have some questions. I would like to use a 16 footer for one space but the ceiling rails would be a max of 11 feet apart so the load at the ends would be cantilevered. I can compensate with extra rollers for bridge tilt but do not know just how accepted this is. I do plan on talking to the manf direct first.
Long rails will be hung from the ceiling beams. The longest section has a Southern Yellow Pine 12 x 12 every 10 feet, they span 24 feet for the floor above. The section that I want the cantilever located wouls have the ceiling rails running the same direction as the pine beams, hence the 11 foot spread.
Any thoughts?
Thanks
Long rails will be hung from the ceiling beams. The longest section has a Southern Yellow Pine 12 x 12 every 10 feet, they span 24 feet for the floor above. The section that I want the cantilever located wouls have the ceiling rails running the same direction as the pine beams, hence the 11 foot spread.
Any thoughts?
Thanks