What's new
What's new

QT250MSY smoothG subspindle bar pull issues

Slothgsr

Aluminum
Joined
Dec 26, 2008
Location
Bethlehem Pa USA
We just got a new machine in and are having some issues with the machine talking to the LNS loader that it opened the chuck so it could count down how many parts are left. We tried the prox switches and the timers and the only way it counts down is if i have the rapid set to %10..

We have the LNS setup to use sub spindle. with 1 chuck open/close



Maybe I have something wrong in the program. Can someone post a picture of the transfer section of a program.

What we are doing is.. Sub grabs part. main unchucks.. Sub pulls out a bit. main clamps.. sync and part off. Sub goes back and then we finish part on sub.


The LNS should count down how many parts are left and the only way it does so is if we change rapid to %10. I have mazak here messing with it and they don't know whats going on. If we figure it out, I'll post solution. TIA

***EDIT***

Figured it out.. It was LNS side. Had to change the time for clamping device to close and open timers to 1.0 and 0.0

Wish we would of called them earlier. ohh well. hope this could help someone else sometime.
 








 
Back
Top