Page 1 of 3 123 LastLast
Results 1 to 20 of 51
Like Tree46Likes

Thread: Anyone's customers doing reverse auction on there parts?

  1. #1
    Join Date
    Dec 2006
    Location
    NJ
    Posts
    1,527

    Default Anyone's customers doing reverse auction on there parts?

    Another corporate idea for a race to the bottom!
    toolmaker96 likes this.

  2. #2
    Laurentian's Avatar
    Laurentian is offline Hot Rolled
    Join Date
    Mar 2008
    Location
    Canada
    Posts
    858

    Default

    What is that ??

  3. #3
    demoj21 is offline Hot Rolled
    Join Date
    Jan 2006
    Location
    IL.
    Posts
    740

    Default

    We just had a customer, in the last 2 weeks start doing this. Must of been a group of buyers got together and came up with another buzz word type trick to cut costs and run vendors into the ground.Later Jason.

  4. #4
    tailstock's Avatar
    tailstock is offline Cast Iron
    Join Date
    Apr 2009
    Location
    Ontario Canada
    Posts
    438

    Default

    Sorry I'm from Canada too, don't understand what the statement means.
    Laurentian likes this.

  5. #5
    Philabuster's Avatar
    Philabuster is offline Stainless
    Join Date
    Jul 2006
    Location
    Tempe, AZ
    Posts
    1,657

    Default Probably something like this...

    Part starts out at $100. Who here can make it for $95? Now $90. Etc. Ultimate race to bottom as the guy in china says he can make it for $5.

  6. #6
    charlie gary's Avatar
    charlie gary is offline Hot Rolled
    Join Date
    Oct 2009
    Location
    near Seattle, Washington, USA
    Posts
    638

    Default

    I didn't realize this was a new practice.

  7. #7
    robert123 is offline Aluminum
    Join Date
    Apr 2012
    Location
    AR, USA
    Posts
    246

    Default

    I did one reverse auction for the government. I put in my original bid and I guess no one bid lower, as we were awarded the contract.

  8. #8
    david n's Avatar
    david n is online now Titanium
    Join Date
    Apr 2007
    Location
    Pillager, MN
    Posts
    2,425

    Default

    I don't think it's all that new of a practice. That scheme just lets you know what customers to cut loose and which ones to keep.

  9. #9
    Winmac is online now Aluminum
    Join Date
    Dec 2011
    Location
    Cape Breton, Canada
    Posts
    130

    Default

    Anyone seen shipping wars? They just under cut each other till theres no money left in it.
    jackal likes this.

  10. #10
    Dualkit is offline Titanium
    Join Date
    Apr 2005
    Location
    Beaverdam, Virginia
    Posts
    3,650

    Default

    Isn't every job put out for bid to more than one shop a reverse auction? It is just closed bid, instead of open bidding.
    Joe Miranda likes this.

  11. #11
    tailstock's Avatar
    tailstock is offline Cast Iron
    Join Date
    Apr 2009
    Location
    Ontario Canada
    Posts
    438

    Default

    You alone know what it cost you to make any certain part, what your overhead is and what you consider a fair profit margin. If someone else thinks they can do it for x dollars less let them. Unless you are way of the mark on your price, you will still be here after they are long gone. Companies will try any ruthless and underhanded trick to get cheap parts, which is what they end up with until they figure out the difference between usable parts and cheap parts. Sometimes you have to draw this to their attention. It won't likely have any immediate affect but will give you lots of ammunition when they come back looking for usable parts again.

  12. #12
    Join Date
    Dec 2006
    Location
    NJ
    Posts
    1,527

    Default

    Quote Originally Posted by Dualkit View Post
    Isn't every job put out for bid to more than one shop a reverse auction? It is just closed bid, instead of open bidding.
    Lol ...you sound like my father!! I agree , but the price they are putting out as the max price is

  13. #13
    doug8cat is offline Stainless
    Join Date
    Jul 2008
    Location
    Philadelphia
    Posts
    1,096

    Default

    If I got the jist of this the bottom line is that the customer is shooting them selves in the foot. Customer says $50 part I say okay I'll do it for $20. Now that 30 dollar difference is going to come out some where: either inferior materials, out of tolerance, child labor, or back dooring materials. I realize the customer has the option of rejecting the parts, but you get what you pay for. Where do customers come up with this crap. It is a loose loose deal, you get rejected parts cause you cut corners & the customer has to go through the whole process again, setting him back on delivery.
    Honesty, integrity and morals are antiques, be honest, develope relation ships; as of late these things have gone straight to the potty. I guess knowbody watches Sesame street any more and learns how to work together and benefit all. This kind of practice is one of many reasons the USA is going to hell in hand basket. Not to knock the practice totally but play fair and it might benefit both parties.

  14. #14
    SND
    SND is offline Diamond
    Join Date
    Jan 2003
    Location
    Canada
    Posts
    8,367

    Default

    When a drawing is sent out for quotes, its expected that since everyone gets the same drawing, and all the information is on the drawing, then "theoretically" the customer will receive the part that is on the drawing, whatever be the price. Lowest bid wins, they said they'd do that's on the drawing for X $, other shop must really suck or have poor equipment if they cost XX$.

    It's not uncommon to be told " we're currently paying $10 for these, can you do it for less ? " sometimes yes, sometimes no.
    So, in one of them reverse auctions, I take it they'll get he lowest bid, then tell every shop quoting that it was who wants to beat it?
    Sounds fun.
    Last edited by SND; 08-21-2012 at 08:28 AM.
    Laurentian likes this.

  15. #15
    CBlair is online now Diamond
    Join Date
    Sep 2002
    Location
    Lawrenceville GA USA
    Posts
    4,003

    Default

    There are all sorts of folks with college degrees in marketing that cant find a job. They are all trying to be creative and make new positions for themselves. I recently meet one of them who has created his own consulting business helping large companies do reverse auctions for outsourced components. The Wall-mart strategy has paid off so well for them thaf now everyone feels the need to do the same thing in every industry.

    For those who think this is nothing new you are wrong, yes people have always hoped to get a better price but it used to be based on the lowest price the market will bear. Now it is down to the person who is most able to be willing to accept the biggest loss or risk. It starts on the larger orders and slowly filters down to the smaller ones.

    Very sad to see....

    Charles
    Laurentian likes this.

  16. #16
    digger doug is offline Titanium
    Join Date
    Oct 2005
    Location
    erie,pa
    Posts
    2,072

    Default

    Quote Originally Posted by SND View Post
    When a drawing it sent out for quotes, its expected that since everyone gets the same drawing, and all the information is on the drawing, then "theoretically" the customer will receive the part that is on the drawing, whatever be the price. Lowest bid wins, they said they'd do that's on the drawing for X $, other shop must really suck or have poor equipment if they cost XX$.

    It's not uncommon to be told " we're currently paying $10 for these, can you do it for less ? " sometimes yes, sometimes no.
    So, in one of them reverse auctions, I take it they'll get he lowest bid, then tell every shop quoting that it was who wants to beat it?
    Sounds fun.

    Yes, but ONLINE, and.....when the program decides, the end date of the auction is extended incrementally
    asthe price keeps dropping.

  17. #17
    SND
    SND is offline Diamond
    Join Date
    Jan 2003
    Location
    Canada
    Posts
    8,367

    Default

    Ahh, open for bid online, nice.
    I think its great, its bound to eventually get rid of some competition, if we can call them that. More like, them making us look bad....

  18. #18
    Cornilsn is offline Hot Rolled
    Join Date
    Dec 2007
    Location
    Portland Oregon
    Posts
    803

    Default

    You bunch of pussies. If you can't compete by streamlining your process, getting faster, etc, you don't deserve the work. Why the fuck should the consumer have to pay higher prices so you don't have to engage your brain and come up with ways to do things less expensively? If another company can do things faster, it's probably because they're better, not because they're bottom feeders. Or maybe because they have expertise in that type of part. Or maybe they have a machine designed to make exactly that type of part. Bid it for the lowest price you can make your minimum acceptable profit, and let it be.

  19. #19
    Dualkit is offline Titanium
    Join Date
    Apr 2005
    Location
    Beaverdam, Virginia
    Posts
    3,650

    Default

    Quote Originally Posted by Cornilsn View Post
    You bunch of pussies. If you can't compete by streamlining your process, getting faster, etc, you don't deserve the work. Why the fuck should the consumer have to pay higher prices so you don't have to engage your brain and come up with ways to do things less expensively? If another company can do things faster, it's probably because they're better, not because they're bottom feeders. Or maybe because they have expertise in that type of part. Or maybe they have a machine designed to make exactly that type of part. Bid it for the lowest price you can make your minimum acceptable profit, and let it be.
    Valid point depending on what you are bidding on. If it is complex work or something that requires specialized machinery you were more likely beat out by someone with better machinery or methods for the job. If it is fairly simple stuff you were likely beat out by a bottom feeder. I knew a guy no longer in business that would bid prototype quantities at large production run prices, he was bidding $3 a part on five piece orders that took him all day to make. He figured it got his foot in the door. All he ended up doing is making $75 dollar parts for $3, I don't think he was in business for more than a year. He was a bottom feeder who benefited no one as his pricing was not sustainable.
    Laurentian likes this.

  20. #20
    Join Date
    Dec 2006
    Location
    NJ
    Posts
    1,527

    Default

    Quote Originally Posted by Cornilsn View Post
    You bunch of pussies. If you can't compete by streamlining your process, getting faster, etc, you don't deserve the work. Why the fuck should the consumer have to pay higher prices so you don't have to engage your brain and come up with ways to do things less expensively? If another company can do things faster, it's probably because they're better, not because they're bottom feeders. Or maybe because they have expertise in that type of part. Or maybe they have a machine designed to make exactly that type of part. Bid it for the lowest price you can make your minimum acceptable profit, and let it be.

    The work is simple. I priced 4 different steel suppliers , the material alone was 70% of the job, plus shipping 8000 lbs on my dime. And your call me a pussy. Your something!

Page 1 of 3 123 LastLast

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •