Home Page Forums Blog Articles Videos Search Register Advertise






Go Back   Practical Machinist - Largest Manufacturing Technology Forum on the Web > Manufacturing Today > Shop Management and Owner Issues (New Forum !)

Shop Management and Owner Issues (New Forum !) Discuss manufacturing and job shop business issues

Reply
 
Thread Tools Display Modes
  #1  
Old 11-04-2009, 09:14 PM
squale squale is offline
Aluminum
 
Join Date: Aug 2004
Posts: 121
Default Need help in laying out new shop.. check out .dxf and let me know your thoughts

I am laying out a new shop and I need some recommendations on how to lay the machines out most efficient. I made a .dxf drawing showing the machines and dimensions.. can somebody take a look and recommend changes or if it's easier you can just change my .dxf file.

Go to this link to find the drawing...
http://jkevin.com/_MISC/CAD/Shop_Layout.zip
Reply With Quote
  #2  
Old 11-05-2009, 04:30 AM
hdrider63's Avatar
hdrider63 hdrider63 is offline
Aluminum
 
Join Date: Oct 2007
Location: Watertown, SD
Posts: 165
Default

Looks kinda busy, but..... It's really kind of hard to make recommendations unless we know what operations are being run through the shop. If you are doing production work you would want to layout cells that would keep all the equipment needed to produce your parts complete without running them all over the shop. If a part has multiple operations you want to set up equipment so it will "flow" through the shop in an inline progression.

If you are not doing production work, it becomes a personal preference and what ever blows your skirt up will work just fine.
Reply With Quote
  #3  
Old 11-05-2009, 05:54 AM
surplusjohn surplusjohn is offline
Diamond
 
Join Date: Apr 2002
Location: Syracuse, NY USA
Posts: 7,010
Default

one thing that takes the pressure off of having to do this perfectly is to make everything easy to move so you can rearrange and adjust as needed. Plugged power and spacers under the machines so you can pick them up easily.
Reply With Quote
  #4  
Old 11-05-2009, 08:48 AM
smallshop smallshop is offline
Titanium
 
Join Date: Jun 2005
Location: montana....miles and miles of wheat...
Posts: 3,766
Default

The plugged power is a great idea. I have done this at 2 shops. Don't think you will nail the layout the first time. With pigtails at the machines you can hardwire the 3phase receptacles at different areas and still rearrange as you wish. Often you will find just moving a machine a couple feet can greatly increase your efficiency.
Reply With Quote
  #5  
Old 11-05-2009, 09:18 AM
Mud's Avatar
Mud Mud is offline
Diamond
 
Join Date: May 2002
Location: South Central PA
Posts: 5,966
Blog Entries: 2
Default

Quote:
Originally Posted by smallshop View Post
The plugged power is a great idea.
If you can find surplus buss duct cheap that's even better.


My first impression is that you are placing everything way too parallel to the walls, it looks like a kitchen, not a shop. My shop work area is very crowded, about 4000 ft sq., and almost nothing is aligned to the walls or to other machines, except for 3 of the 4 CNC machines and that's because it worked best for them. The 2 bridgports turned slightly is a good start, now look at the saws and lathes, and see how they can be placed to be more accessible, for example my 2 engine lathes are back to back with a space between them where I put trash cans and etc which can be removed to get access to the backs of the machines if necessary. Plus back to back keeps one operator from being showered with chips from the machine behind him. Make the cutoff saw moveable, wheels if necessary, I put mine on a frame that I pick up and move with a pallet jack for when I cut extra long stock that must be moved with a forklift. I put 3 mills in a circle with the backs facing inward. My vertical bandsaw is next to a vidmar cabinet and the table gets used for a sorting table. some of your machines are only 1' apart and the VMC is 1' away from the walls, 1' is not enough room to squeeze into unless you are 98lbs. Move the VMC into the middle and put a workbench/drillpress/etc against the back of it, something that can be moved if needed to access the machine for maintenance.

It's a cliche anymore, but think outside the box.
Reply With Quote
  #6  
Old 11-05-2009, 09:19 AM
rj newbould's Avatar
rj newbould rj newbould is offline
Titanium
 
Join Date: Aug 2005
Location: Hernando, FL
Posts: 3,832
Blog Entries: 8
Default

+1 on the plugged power.. ALL my equipment is like that except central air.

Whatever is practical, I put on wheels.
Reply With Quote
  #7  
Old 11-05-2009, 09:30 AM
hesstool's Avatar
hesstool hesstool is offline
Hot Rolled
 
Join Date: Oct 2007
Location: Richland, WA
Posts: 803
Default

I would take the time to accurately represent your machine measurements. For instance, your Bridgeport mills are a 3x3' square, but in reality they should look somewhat like a "T". You'd be amazed how much space you "free up" using this method. In reality, that 1' space between your Atrump and Bridgeport really isn't 1'.

Also, I would recommend you not place your surface grinder next to 2 Bridgeports. You need to try and isolate the grinder in a "dirty" area, say next to your saws or something. You don't want the nastiness from the grinder settling on your mills/lathes as it will eventually cause damage. Once you find a suitable place for it, angle it so that the grinding mess is thrown towards a wall.
Reply With Quote
  #8  
Old 11-05-2009, 04:36 PM
Tonytn36 Tonytn36 is offline
Stainless
 
Join Date: Dec 2007
Location: Southeastern US
Posts: 1,881
Default

In order to comply with NEC and OSHA, you need 36" of clear area directly in front of any electrical cabinet. This includes any machine electrical cabinets, breaker boxes, etc. Any electrical cabinet door must have enough clearance that it can be opened 90°. For example, if the cabinet door is 24", 36" clearance is the minimum, BUT, if the door is 48", then 49" (or whatever is required to allow the door to open 90°) is the minimum clearance.
Reply With Quote
  #9  
Old 11-05-2009, 04:57 PM
Limy Sami Limy Sami is offline
Titanium
 
Join Date: Jan 2007
Location: Norfolk, UK
Posts: 3,127
Default

Always an interesting subject.

I can't open DXF files here,............ please could someone put it up as a pic of some description?

Thanks.

Sami
Reply With Quote
  #10  
Old 11-06-2009, 08:17 AM
sharrozap's Avatar
sharrozap sharrozap is offline
Plastic
 
Join Date: Jul 2007
Location: Edmonton,Alberta
Posts: 30
Default

Quote:
Originally Posted by Limy Sami View Post
Always an interesting subject.

I can't open DXF files here,............ please could someone put it up as a pic of some description?

Thanks.

Sami
X2, I have Mac.
Reply With Quote
  #11  
Old 11-06-2009, 01:04 PM
Steve@Reliance's Avatar
Steve@Reliance Steve@Reliance is offline
Cast Iron
 
Join Date: Dec 2006
Location: Milton Ontario Canada
Posts: 478
Default

I would angle all the mills along one wall and all the lathes on the other wall. Put tooling storage and the benches down the center of the shop so whichever machine your working on you don't have to walk far. It dosen't sound to important but adds up to a lot of time in the long run.
Reply With Quote
  #12  
Old 11-06-2009, 04:56 PM
Kanoa9321 Kanoa9321 is offline
Aluminum
 
Join Date: May 2007
Location: Orange County, CA
Posts: 113
Default

Quote:
Originally Posted by sharrozap View Post
X2, I have Mac.
X3 Thats why I always save stuff like this into a pdf, everyone can open a pdf.
Reply With Quote
  #13  
Old 11-07-2009, 08:18 AM
HuFlungDung HuFlungDung is offline
Titanium
 
Join Date: Jan 2005
Location: Canada
Posts: 3,750
Default

I would place the cutoff saw near a doorway, or near a wall where a hole could be made to feed stock through to the saw.

I would also agree with more concise outlines of each machine. Mills need a T shaped space as long as the max table travel in both directions plus a couple of feet of clearance at those positions. There may be important space going to waste behind the overarm of the vertical mills. Back to back vertical mill arrangements may make better use of otherwise dead space.

Consider placing your lathes in a squared arrangement where all the operators work inside the enclosed square space. Ideally, 3 lathes around 3 sides of the square, and the 4th side left open for easy access. You might angle them slightly as well, to try to alleviate the direction of chips flying out of the chuck or back of the spindle. But plan on putting up some chip guards. A workbench can be rolled in or out of this lathe area through the open side of the arrangement.

If the lathes have taper attachements, leave some room to get behind them.

I like the cheap 18 x 27" six or eight drawer metal toolchest (on wheels) for a toolbench at each machine. So a bunch of those spread around the shop need to be modelled in as well. It is possible to build hutches for such toolboxes, with a pegboard back fastened to the back of the tool box for hanging up whatever can be hung.

I don't have large work benches in my shop, because they tend to get piled high with junk. Fight junk by hanging stuff up on pegboard. In fact the largest table I have is the welding table which is 3 feet by 6 feet. You might be doing a lot of assembly work, but if that is sporadic, then make your workbenches modular, like 4 small benches that can be rolled together to make a larger bench when necessary. But small workbenches to hold a heavy part are nice when you have to wheel it over to the lathe area or something. But don't plan on using the toolbenches for workbenches, because machinists need room for their hand tools when working. Let the portable workbenches hold the parts.
Reply With Quote
  #14  
Old 11-07-2009, 08:48 AM
T-K T-K is offline
Plastic
 
Join Date: Nov 2009
Location: Norway.
Posts: 1
Default

How many do you plan that should be able to work in that shop?
I would try to screen the surface grinder from the other machines, the grinding swarf and dust tend to wear a lot on other machines.

Quote:
I like the cheap 18 x 27" six or eight drawer metal toolchest (on wheels) for a toolbench at each machine. So a bunch of those spread around the shop need to be modelled in as well. It is possible to build hutches for such toolboxes, with a pegboard back fastened to the back of the tool box for hanging up whatever can be hung.
I agree. Those are nice for tooling at each machine.

Best regards
Thomas.
Reply With Quote
  #15  
Old 11-07-2009, 09:35 AM
specfab specfab is offline
Aluminum
 
Join Date: May 2005
Location: AZ
Posts: 194
Default

Most of the comment made already covers it as I see it. Definitely get that surface grinder segregated, maybe grouped in same area as saws if you can't give it its own little enclosed area. Also consider where doors are located (or are to be located, if this is new construction), for both machine/material access and human traffic that may interfere with operator activity. It's a guessing game for outside observers without knowing what kind of work you do, though. Buss duct is a fabulous way to go if your budget works, but in any case, put everything on plugged cords that you can.
Reply With Quote
  #16  
Old 11-07-2009, 10:39 AM
dfw5914's Avatar
dfw5914 dfw5914 is offline
Hot Rolled
 
Join Date: Apr 2006
Location: Keller, TEXAS
Posts: 909
Default

Screen print:Click image for larger version

Name:	Layout A.jpg
Views:	30
Size:	84.5 KB
ID:	16978 (click to enlarge)
Reply With Quote
  #17  
Old 11-07-2009, 10:44 AM
dfw5914's Avatar
dfw5914 dfw5914 is offline
Hot Rolled
 
Join Date: Apr 2006
Location: Keller, TEXAS
Posts: 909
Default

That attachment is just too small. Here is one you may be able to read:



Then again maybe not.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 12:07 AM.
Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Forum SEO by Zoints
Ad Management plugin by RedTyger