JHOLLAND1
Titanium
- Joined
- Oct 8, 2005
- Location
- western washington state
in 1985 I destroyed a 20 ft segment of 30 ton crane lattice boom--70 ft loa-- by placing
side load in a negligent manner--two weeks of welding put boom back in action --
with permanent tilt
linked video documents more costly event--parted wire rope results in load drop
and decent of block/hook of 14000 tonne barge crane
https://youtu.be/GtoYy5KuNMg
side load in a negligent manner--two weeks of welding put boom back in action --
with permanent tilt
linked video documents more costly event--parted wire rope results in load drop
and decent of block/hook of 14000 tonne barge crane
https://youtu.be/GtoYy5KuNMg