I need some help. I have always been an employee. I have put in some long hours and worked with many teams to pull off some crazy things but I have never seen the invoice. Never had to make the call on what all of it is worth.
I just recently had a call from an old boss of mine, he gave my name to a guy who runs a hot rod shop and needed a hand with some CAD.
He needs a manifold for a straight six, changing it to a three carb set up from a single carb. Essentially three manifolds on a very custom design. (My end will be just the production of the manifolds, NOT balancing them and getting it to idle.... I will work with them to ensure that the needed features are present, ie balance ports and throttle linkages....)
I have the drawing done and the first prototype 3d printed, I am fairly confident that I can investment cast it out of A356. failing that I can machine it out of 6061 in two parts and weld it together.
BUT...... I literally have NO idea what to quote this guy.
-I don't want to screw this guy over, he is related to my current boss, I mean I wouldn't want to screw anyone over. But this car isn't his, it's a job he took on then had a hard time finding a local company to do the design and machining...
-this guys shop is busy, if I get this right there will almost certainly be more work coming my way. Double edge sword there though, if I price this one too low to get the work would I be expected to be cheap on the next jobs?
-I don't want to work for free, I can work over time at my day job if I pass this up
-I am confidant I can do this, I have the tools and feel good about my skills, I enjoy this work, if it goes sideways I want it to go sideways fast, so that I have time to sort it out before the deadline in mid December. So I want to give him a number soon and order the materials.

I just recently had a call from an old boss of mine, he gave my name to a guy who runs a hot rod shop and needed a hand with some CAD.
He needs a manifold for a straight six, changing it to a three carb set up from a single carb. Essentially three manifolds on a very custom design. (My end will be just the production of the manifolds, NOT balancing them and getting it to idle.... I will work with them to ensure that the needed features are present, ie balance ports and throttle linkages....)
I have the drawing done and the first prototype 3d printed, I am fairly confident that I can investment cast it out of A356. failing that I can machine it out of 6061 in two parts and weld it together.
BUT...... I literally have NO idea what to quote this guy.
-I don't want to screw this guy over, he is related to my current boss, I mean I wouldn't want to screw anyone over. But this car isn't his, it's a job he took on then had a hard time finding a local company to do the design and machining...
-this guys shop is busy, if I get this right there will almost certainly be more work coming my way. Double edge sword there though, if I price this one too low to get the work would I be expected to be cheap on the next jobs?
-I don't want to work for free, I can work over time at my day job if I pass this up
-I am confidant I can do this, I have the tools and feel good about my skills, I enjoy this work, if it goes sideways I want it to go sideways fast, so that I have time to sort it out before the deadline in mid December. So I want to give him a number soon and order the materials.