goldenfab
Cast Iron
- Joined
- May 25, 2016
- Location
- USA Prescott , Arizona
The riggers pulled through. They were professional, competent and I have no complaints with the work done. Based on the times they were here plus travel it should have been around an 8 hour day for them.
Like I said some of the scheduling delay was due to trying to organize doubling up with other work in the area since there is so much cost in travel time where I am. What set me off was getting such a high estimate at 4:30 the day before. Felt like they were trying to take advantage of the situation, maybe not but rubbed me the wrong way. I've talked with several people who have used them and have never heard anything negative about them. Hopefully they charge me a fair price. It's water under the bridge now.
The day went really well. Turning around in my driveway was a little tight but not a problem. They brought a 15k cushion tire forklift to move the machines inside building and the 30k pneumatic tire forklift for the most of the loading/unloading.


Like I said some of the scheduling delay was due to trying to organize doubling up with other work in the area since there is so much cost in travel time where I am. What set me off was getting such a high estimate at 4:30 the day before. Felt like they were trying to take advantage of the situation, maybe not but rubbed me the wrong way. I've talked with several people who have used them and have never heard anything negative about them. Hopefully they charge me a fair price. It's water under the bridge now.
The day went really well. Turning around in my driveway was a little tight but not a problem. They brought a 15k cushion tire forklift to move the machines inside building and the 30k pneumatic tire forklift for the most of the loading/unloading.

