martin_05
Hot Rolled
- Joined
- Mar 11, 2009
- Location
- Valencia, CA, USA
Talking about buying a new VF2-SS and stuffing it in the garage. It fits. Some disassembly required to get it in. No big deal, the Haas guys know how to do it (they told me about a VF2 going into a basement many years ago and having to disassemble the thing to it's bare naked essence).
Not getting through spindle high pressure coolant primarily due to power requirements. Also, not sure I need it. The machine will mostly do prototyping and small scale production when/if needed.
Anyhow, the question is about electrical power. I have one of these wonderful California track homes where they put in 100A panels. Am I in trouble? Can I run this machine or do I have to upgrade to 200A service.
I don't mind upgrading. It'd be nice to be able to start using it and schedule the upgrade for a couple of months from now.
Thanks,
-Martin
Not getting through spindle high pressure coolant primarily due to power requirements. Also, not sure I need it. The machine will mostly do prototyping and small scale production when/if needed.
Anyhow, the question is about electrical power. I have one of these wonderful California track homes where they put in 100A panels. Am I in trouble? Can I run this machine or do I have to upgrade to 200A service.
I don't mind upgrading. It'd be nice to be able to start using it and schedule the upgrade for a couple of months from now.
Thanks,
-Martin