Hi fellow members.
On a Matsuura MAM72-VS (Vertical machine with B axis tilt / C axis rotation) I'm running into a situation with simultaneous 5-axis rapid motion. That is, the axis are completing their commanded motions interdependently, and I get a "dog leg" effect.
I would like the Fanuc 16i-M control to manage the rapid moves to arrive at destination simultaneously. Unfortunately, I don't know the parameter setting, if there's even one.
Thank you for your help.
Mark S.
On a Matsuura MAM72-VS (Vertical machine with B axis tilt / C axis rotation) I'm running into a situation with simultaneous 5-axis rapid motion. That is, the axis are completing their commanded motions interdependently, and I get a "dog leg" effect.
I would like the Fanuc 16i-M control to manage the rapid moves to arrive at destination simultaneously. Unfortunately, I don't know the parameter setting, if there's even one.
Thank you for your help.
Mark S.