Ox
Diamond
- Joined
- Aug 27, 2002
- Location
- Northwest Ohio
Looks like we have a production job of CI coming in this spring.
Nothing fancy - just drilling through holes.
I have never ran cast in a production environment, and specifically try to shy away from it for the most part unless the qty is either really low or really high. I guess this job meets the upper threshold close enough, so it looks like we are going to run with it at this point.
My Q revolves around handling the chips.
Doo you handle them any differently than steel?
This is coolant - so we wouldn't be spinning them - and I can see that plugging up a spinner screen real quick ...
I guess at this point I am just looking to run them into a hopper and let drain, and then dump in big tub outside.
???
-------------------------
Think Snow Eh!
Ox
Nothing fancy - just drilling through holes.
I have never ran cast in a production environment, and specifically try to shy away from it for the most part unless the qty is either really low or really high. I guess this job meets the upper threshold close enough, so it looks like we are going to run with it at this point.
My Q revolves around handling the chips.
Doo you handle them any differently than steel?
This is coolant - so we wouldn't be spinning them - and I can see that plugging up a spinner screen real quick ...
I guess at this point I am just looking to run them into a hopper and let drain, and then dump in big tub outside.
???
-------------------------
Think Snow Eh!
Ox