Long story short, I need to move into a building I bought. It has a 200 amp 208 volt 3 phase service. One of my machines is a 50 taper MITS hmc that books at 84 kva. So there goes that service. I put an amp clamp on it and the only time I see much over 40 -50 amps is at spindle start and stop, where I may see anywhere from 80-180, some times 200. Not sure why it varies so much??? Do you think Id be ok running off that 200 amp service?? The rest of my machines are in the 7.5 to 20 hp range, when I put the amp clamp on those I dont see much over 60 amps. These machines I intend to power off of a 200 amp 208 volt single phase service (I have two services in the building, one 3 phase, 1 single phase) and a PT380 phase perfect. Im a one man band so probably wont see more than 2-3 machines running at once at the most. I was going to up grade the service but thats like 3 times the cost of a PT380!! I know there are about a million variables, but does it sound possible??