By accident I won a Moore Jig Bore, No3. Yes, I was messing around actually waiting on a CNC to come up and ended up watching several other items to get an idea of what the crowd was doing as far as spending money.
I ended up hitting the "place a bid" button (live auction) and well no one seemed to want to bid on it. So now I am the owner of a Moore No3.
I need to pick it up this week and need advice on moving it. I have read that the table is held by gravity and this could pose some issues while driving down the road.
Has anyone moved one recently and what precautions did you take specific to a Moore No3 Jig Bore?
It is 5,000lbs, I do have the means to move with a 15k flat bed and unload with a forklift. I have moved many machines, so I am familiar with safely loading, strapping, and unloading.
Thanks,
I ended up hitting the "place a bid" button (live auction) and well no one seemed to want to bid on it. So now I am the owner of a Moore No3.
I need to pick it up this week and need advice on moving it. I have read that the table is held by gravity and this could pose some issues while driving down the road.
Has anyone moved one recently and what precautions did you take specific to a Moore No3 Jig Bore?
It is 5,000lbs, I do have the means to move with a 15k flat bed and unload with a forklift. I have moved many machines, so I am familiar with safely loading, strapping, and unloading.
Thanks,