Bob E
Hot Rolled
- Joined
- Sep 25, 2006
- Location
- Middletown, PA
Customer emails this morning with an emergency shaft that needs made for his customer.
Check my steel suppliers, closed Good Friday. Call customer and determine a repair of existing shaft is OK.
Did a heat shrink/weld repair within .001" runout on entire shaft.
Delivered at 4PM.
I was kind of balking on this repair until I saw they're making the bottles for hand sanitizer.
Check my steel suppliers, closed Good Friday. Call customer and determine a repair of existing shaft is OK.
Did a heat shrink/weld repair within .001" runout on entire shaft.
Delivered at 4PM.
I was kind of balking on this repair until I saw they're making the bottles for hand sanitizer.