Trboatworks
Diamond
- Joined
- Oct 23, 2010
- Location
- Maryland- USA
I have to cut out the cast 90 septic pipe and replace with PVC.
The 90 is cracked and leaking.
Any plumbing savvy folk here.
I guess I need to replace a street 90 right to where it is inserted into the bellmouth of another street 90 which is buried in grade.
Crap- literally.
I can go cry at the parts desk of a pro plumbing supply outfit but anyone know how this transition can be made up?
Are these joints lead sweated together?
I was rather thinking I was just doing a rubber clamp on collar made for iron to PVC but would need to trench further to get to straight pipe.
Maybe the best move is to cut grade back till I reach the straight pipe run and splice in there..
The 90 is cracked and leaking.
Any plumbing savvy folk here.
I guess I need to replace a street 90 right to where it is inserted into the bellmouth of another street 90 which is buried in grade.
Crap- literally.
I can go cry at the parts desk of a pro plumbing supply outfit but anyone know how this transition can be made up?
Are these joints lead sweated together?
I was rather thinking I was just doing a rubber clamp on collar made for iron to PVC but would need to trench further to get to straight pipe.
Maybe the best move is to cut grade back till I reach the straight pipe run and splice in there..