Mebfab
Diamond
- Joined
- Jun 7, 2003
- Location
- Mebane North Carolina USA
Building a 36x80 shop. Putting down 6" concrete floor. 10" deep, 24" wide footing. Block wall, 7 course on half, 4 course other half. Bond bridge all the way around. Rebar in footing, vertical to bond bridge, rebar in bond bridge. Fill all block with concrete. Wire and plastic barrier under floor.
$26k plus material. This sound right?
$26k plus material. This sound right?