We are looking to get a Haas Super Mini Mill 2 here at work. Unfortunately the building wasn't originally intended for industrial use, and as a result does not have industrial access. The major bottleneck is actually an elevator. Elevator is heavy duty and well serviced.
I am wondering if anyone has any experience with partial tear down / assembly to get a machine where it needs to be, likely using a professional to do that. Trying to see if this is a viable option. Even if expensive, in our situation it may be very well worth it to pay a premium to have it done.
I have contacted a rigger and am waiting on a response / meeting, but a large scale rework of the machining area is lingering on what we determine with the CNC option. Thanks in advance for any advice / input.
I am wondering if anyone has any experience with partial tear down / assembly to get a machine where it needs to be, likely using a professional to do that. Trying to see if this is a viable option. Even if expensive, in our situation it may be very well worth it to pay a premium to have it done.
I have contacted a rigger and am waiting on a response / meeting, but a large scale rework of the machining area is lingering on what we determine with the CNC option. Thanks in advance for any advice / input.