What's new
What's new

RFQ x1 unit NOTE: deep small hole

Stirling

Hot Rolled
Joined
Dec 11, 2013
Location
Alberta canada
RFQ
x1 unit
lead time 1 month

6061 aluminum

part is a pressure test fitting, must hold 1000psi
NOTE: hole may be slightly larger than specifyed, may be cut from 2 sides as long as they join reasonably. fluid goes through hole.


IMG_1997.jpg

we are located in Alberta Canada

Thanks
 
RFQ
x1 unit
lead time 1 month

6061 aluminum

part is a pressure test fitting, must hold 1000psi
NOTE: hole may be slightly larger than specifyed, may be cut from 2 sides as long as they join reasonably. fluid goes through hole.


View attachment 322268

we are located in Alberta Canada

Thanks

I am also in Alberta. I can't read the drawing but I have some experience with small deep holes.
 








 
Back
Top