We are planning an addition to our shop. The main necessity is a paint area for large items we manufacture. Thinking of going 45' Wide by 80' Long and 20' sidewalls roughly. The Paint area would be on the last 30' of this building. We originally planned to close this off so paint fumes and steam from washing would not enter the rest of shop. We want to put a crane in the 50' part for fabrication area. Now we have located 2 used 5 ton bridges approximately the right width for a good enough price we are considering adding both to our rail. Is there a good way to have the paint bay sort of closed off and still run our crane over the wall to carry things into the paint bay in place of forklift? Best idea we've had is build the wall with a gap for crane. We would still have a doorway in middle, then some sort of flaps to close the gap up there.