Hey Guys,
I'm running into a problem in our shop. Currently we are making some rather large reamers .375" - 1.25" in diameter about. We've ran into a problem transporting them between operations in our shop.
Currently the process goes as follows:
[*]Swiss
[*]clean
[*]grind
[*]clean
Blanks are transported in egg cartons as trays after that. Looking for other ideas of ways they can be transported operation to operation. Currently the egg cartons are used due to the weight of the reamers. Other trays we've used can't withstand the weight of the reamers. Problem with the egg cartons is we think it's a matter of time until they are dropped and once the reamers are ground they cut up the egg cartons.
Posting to see if anyone has any experience with any of these problems and if they have any suggestions of ways to transport these parts to different operations in the shop.
Thanks,
I'm running into a problem in our shop. Currently we are making some rather large reamers .375" - 1.25" in diameter about. We've ran into a problem transporting them between operations in our shop.
Currently the process goes as follows:
[*]Swiss
[*]clean
[*]grind
[*]clean
Blanks are transported in egg cartons as trays after that. Looking for other ideas of ways they can be transported operation to operation. Currently the egg cartons are used due to the weight of the reamers. Other trays we've used can't withstand the weight of the reamers. Problem with the egg cartons is we think it's a matter of time until they are dropped and once the reamers are ground they cut up the egg cartons.
Posting to see if anyone has any experience with any of these problems and if they have any suggestions of ways to transport these parts to different operations in the shop.
Thanks,