HCN mazak 6800 automate artifact
Close
Login to Your Account
Likes Likes:  0
Results 1 to 1 of 1
  1. #1
    Join Date
    Mar 2020
    Country
    UNITED STATES
    State/Province
    Oklahoma
    Posts
    1
    Post Thanks / Like
    Likes (Given)
    0
    Likes (Received)
    0

    Default HCN mazak 6800 automate artifact

    We have a FMS system with 4 hcn 6800's , We run an artifact on these machine weekly to determine the state of the alignment. Right now the operators manually do this, which shuts off production. We are looking into automating this artifact routine by creating a "schedule", (our scheduling software is SAIL), we can easily create the schedule, but our dilemma is that we would like to be able to leave the artifact in the "in" position instead of on the table while we run our warmup program which will also allow the coolant to stop dripping from niagara. Is there a variable in the cell controller that would allow us to do this? or has anyone done something like this??


Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •