What's new
What's new

Mazak VQC 20/50A delay between units

mada87

Aluminum
Joined
Dec 27, 2017
So I have a VQC 20/50a that runs pretty decent but have noticed that it moves quickly within a unit or when going to a new unit with a different tool but when you have the same tool prioritized to be used within several units it will stop and wait with a long pause before moving to the next unit. I thought that maybe there was a parameter that would control this time/delay, but haven't been able to find anything. Is this just the case of an old machine that that is how it works or is there some parameter that I am missing?

Thanks
 








 
Back
Top