As title suggest, is it possible to run with C-axis brake by adding M-codes in the operation?
Currently running a small part with 72 threaded holes around the OD, and by milling/drilling/chamfering and threading it's 4 tools x72 holes x20parts.
Safe to say there's too much downtime by just clamping and un-clamping C-axis between holes. Would be great if it could just run with the brake on.
Integrex I500
Smooth X
Currently running a small part with 72 threaded holes around the OD, and by milling/drilling/chamfering and threading it's 4 tools x72 holes x20parts.
Safe to say there's too much downtime by just clamping and un-clamping C-axis between holes. Would be great if it could just run with the brake on.
Integrex I500
Smooth X