Using a Mazak Lathe M5, Control is conversational only.

I am trying to machine a piece in two stages. Piece is an 8" Tube, which needs turned on both ends. Once the first operation is complete I need the tool to go into home position. I will flip the piece around and then continue the second operation.


What has been happening is in between units M0, I used UNIT Manual to send tool to home position, but it doesn't read next UNIT M0. Once it goes to home position and the tool changes it continues to run. I need this to stop until I manually hit start to run the second operation.

Can anyone help?
 
You will have to use Manual Program for the M0 (Change point 1). That is how I have always done it, works like a charm.
 
Move tool away with your TPC and put M0 on last relay point. Or write a second program for the second op and use your END line to switch between the two programs automatically. I've done this both ways but prefer the second option because i feel it is safer.
 
I don`t now on T-plus control how , on M2 & M32 no problem.