I was going to wait till I'd finished the RPC and had machine tools running, but I lost some pictures when the laptop crapped out, and figured I better post these before I lose them.

So here goes; my shop thread. Some of ya'll have seen these pictures, but going to try and explain them a bit better this time around.

I started land clearing for a building back in October or November of last year. Hired a guy with a 250G, he'd tear the brush up then load my 1969 F600 grain truck up, and I'd haul the brush out to the field.

Doing this during school, and dealing with initial stuff for Dad's estate meant this was slow going.

Progress was also slowed because the guy I wanted the guy that did the land clearing to also do the dirt work. About the time I wanted to start moving dirt, he won the contract to do dirt work for a CVS.

So instead of finding someone else to do dirt work for me, like I probably should have, I ended up working for that Dirt guy on that CVS job.
 

Attachments

  • 1106161025_HDR.jpg
    1106161025_HDR.jpg
    96.8 KB · Views: 2,610
  • 1106161028_HDR.jpg
    1106161028_HDR.jpg
    96.5 KB · Views: 1,646
  • 1106161409.jpg
    1106161409.jpg
    97.6 KB · Views: 1,474
  • 1106161226_HDR.jpg
    1106161226_HDR.jpg
    96.7 KB · Views: 1,459
Last edited:
CVS dirt work

About 700 loads of haul off I think. 500 loads of fill dirt went back under the building pad then lime stabilization for the parking lot area.

Learned a lot about dirt work and that side of construction, fun stuff.
 

Attachments

  • 0112171046.jpg
    0112171046.jpg
    98.9 KB · Views: 1,016
  • 0224171013.jpg
    0224171013.jpg
    96.6 KB · Views: 972
  • 0224171038.jpg
    0224171038.jpg
    99.1 KB · Views: 1,003
  • 0224171548.jpg
    0224171548.jpg
    98.6 KB · Views: 983
  • 0204170818_HDR.jpg
    0204170818_HDR.jpg
    97.8 KB · Views: 923
Didn't do my dirt work until the last week in December IIRC, got it all done in two days. Hauled the guys 250G in at about 3pm, straight from finishing up the CVS job, then worked till dark getting the hole ready for back filling.

The next day was hauling in fill dirt. Used a company that was expensive, but they had a lot of truck. We had over 30 end dump semis and dump trucks bringing in dirt.

It was pretty cool, at the start of the day had trucks backed up about 1/2 mile down the road waiting to dump.

I was also a slightly wet soggy day, each end dump would drive in, get stuck up the axle, have to be drug the rest of the way in with the dozer, then I'd pull them out empty with the 930.

It was a BUSY day. Right at 150 loads I think. Dirt guy was running the dozer, I was shooting grade, running the roller, directing trucks and pulling trucks out with the tractor.

Got the whole pad put down in 7 hours though.

The picture upload thing on PM is being really stupid for some reason. Having to write the post here, then attach the picture with my phone....:angry:
8b2c198d1bda4c01cecfbba5b33a0283.jpg
7ebd82d58a1e9aa6fd9b7faa8f8e3e6c.jpg
07e6e030c8228485cb0a473e99c768d2.jpg
01fea0f40dbac3478c448a5320496427.jpg
ccf17edca9f3af291fcc15a6f73cfe5b.jpg
eca63e8e11f630913dde46b7760f4680.jpg
593a425d0b83d0ced8a69fe1ec8732fc.jpg
904f14679755d9c7ef97e72a62af090e.jpg
a7d82675731637e947b898bb8c5165f9.jpg
 
I rented a Home Depot trencher for the under ground electrical hook up. Well that sorry piece of junk was totally useless.

So ended up using the 250G to make the trench. So yeah, 48" wide "trench" for a 2" conduit....

It was very nice to use that excavator with a thumb to set the telephone pole.
6f43482696db1ee2bdfb8a0d2b4d8962.jpg
fe02628e80f8814b5a7f3ed70c53c5a7.jpg
ecb980c7e3662b484c3cfcfa41371e99.jpg
6edac37e8a828c991600307c4d3850b1.jpg
 
After the under ground electrical was laid, the next step was crushed conrete for the driveway/yard.

Laid down geo fabric to start, then started with a layer of bull rucks (4"-6"), then a layer of fines (1" and below). Total of 30 loads so far, and it's still not done a year later because this stuff is EXPENSIVE, and don't have the cash for the other 20 loads I still need.

But enough has been laid down that it's functional, but not ideal.
25492d56a6ff4370e4eedb4c07e6ce6f.jpg
8ec24d743c14a3702a4feba96cb90176.jpg
58457cc4e279c8505b97d65342e9ef7b.jpg
 
While I was laying down rock, the building guys were laying out for the building. These guys did a decent job, and the price was reasonable, but they were SLOW...

Once I finished the driveway to an acceptable level, we called the concrete trucks. Went pretty smooth, couple got stuck, but no big deal.

I normally think writing in wet concrete is pretty annoying, but considering I was paying for the shop with Dad's life insurance. I put his initials in the slab.
1c26146392a539c490d8a84a93527252.jpg
045a248909e0c6e9eaf70949b968e841.jpg
a5d278f9498132355287b51785f2edfc.jpg
989172576f7ea214ebd56e7315c60aea.jpg
4595f91d6e2106168700e2a841b49a88.jpg
d4d23314a9219e314341a374e3aad8cc.jpg
092e6cbe70fe2af4a103a86480674bb2.jpg
8cb1fd0ad4d6aafcd8ddf92de401cc13.jpg
5165de93e82ef46f72a790f5ee2e05d8.jpg
 
Man ya'll are gonna hate me....

All these full bleed pictures are gonna make your internet hook ups really groan under load....

But this brings us to early March I think, and this brings us to the first machine moved in. This 40x10' planer, weight was 24,300 lbs according to the scales on the Versalift.

http://www.practicalmachinist.com/v...istory/auction-older-antique-machines-330807/

A lot of the pictures I just posted, are also posted in that thread.

11c8977cb8f9722c2a4791c9b7321686.jpg
ca9cdb8cc3758b68d3ab48ab46a4783f.jpg
a03d22b059a1b893fecc4b38b82eb5a4.jpg
10ff6b65612e7201c3d42983c707d083.jpg
808f9b6b224741f33e27f696b3e3c3ff.jpg
e69231c73b0a655532838863a6fc78d5.jpg
61417e73f21590c6d497eaab29ef8c87.jpg
b0dfc804b8bd9367473c04d971b9158c.jpg
60312b99dd28ebc00a093d5d2d10b91c.jpg
fc01b70b65f0f0669ce6fb4329ad7edf.jpg
876fd606ed8faa9878052f4aa22cf65f.jpg
6580343cf2135a5548c4f41663423eb0.jpg
87bcb14c01df60e503cad53146772888.jpg
f57fa6d9f98fc86cd1c1bfe5c37ed580.jpg
eb43378933b4ec1313b92947183bff2f.jpg
61b3761517aecd775459ff1dc374ce08.jpg
a6ba0212f57485efe8c8d4c84ec7db68.jpg
c18a60b98d953ab0f8eb68db71015789.jpg
24e38ed132e3d4cda639b9898a1a3430.jpg
c76f334162a0afd39bfeb330690d747f.jpg
 
Once again I apologize for all the pictures, seems kinda excessive in retrospect. But without Photobucket, and with the regular picture upload function acting up, this is the only way I can think to upload them.

I've started working in a machine shop recently, and have to work tomorrow. So I suppose this is a reasonable stopping point for now.

Got lots more to post.....

Great pics.

Thanks.
 
Thanks guys yeah, last year's been rough, but I try to stay positive. I've been very lucky.

So I left off at about March; at this point I've got a brand new building shell, no power, no doors, and one machine moved in.

I did as much of this as I could by myself, because the the building came in way over budget (surprise surprise) and pretty much everything was done by the seat of my pants.

Between the permit process taking for ever and me realizing I hate working with 2/0 cable in a 2" coundit, it took me all of spring brake to finish the electrical hook up.

Also I'm not dealing with just machine tools, Dad also had collected a considerable pile of old farm machinery. So a lot of time was spent in this early phase just getting used to working under a roof, and getting some of these dead farm machines closer to the shop.

First order of business was to get the planer moved out of the way. Truck unloaded it literally right in the middle of the shop, highly inconvenient.
fd19a540d96b85acf6d41d750f524381.jpg
126d97d9878cfa2e8ad947c9455bfd83.jpg
33385d0e54dfb94ab99821f68b40bdb5.jpg
77f717db6ebe26eda306010bc5803c51.jpg
1722d5992a57d6ea88307833fc198e1d.jpg
89e281019e36078a07621a77f5e078cb.jpg
977f1c4e156b09e4474dbd52901628c6.jpg
 
Dad bought this combine from an 85 year old lady in Flatonia TX. The family bought it new in the late 60's, then farmed with it for like the next 20 years.

They took care of this thing like their first born, the lady was moving into the nursing home so they family was selling off the farm house and cleaning up the property. This combine had been sitting for who knows how long, Dad always loved to tell that all this thing needed was clean gas and a hot battery.

When they drove it out, it looked like it was brand new. Which is very rare considering how these rice combines were treated.

As we were getting ready to leave, the old lady came out and asked if we wanted the manuals for it. Of-course we did, when she came back she was crying, to buy this machine took everything the family had at the time.

Dad had sold the first farm when he bought this combine, so he drove it from Flatonia to our house in Houston and parked it in the back yard.....

Well it had been setting for about 5 years under that hastily built cover, and I decided to move it to the better lean too of the new building.

Had to disassemble the starter, new coil, new spark plug cables, new points and clean gas it fired right up. I remember the day Dad drove it into that little cover, felt good (but also kinda sad), to be driving it out.

Also did a full cylinder repack to the W-11, all 5 cylinders. I actually had Mark Vonleyser (a PM member) do it for me, I was busy with school.

Being able to park equipment under at least a roof, is SO nice.
52d99244839d29760eed549acd4c922d.jpg
96d6f87b6f902b83402ad301c3e92958.jpg
116ffc47227b2aed48663df1b727d1af.jpg
14023567dcf2f895ae88297b87c5cba8.jpg
d03f344905324d889a6caf674fca139c.jpg
5a3d5fcda1cffdc885f85e23de79414b.jpg
6288d4bd3f6881aeaf6d07feb914b3b2.jpg
 
You should do a shop tour video with a description of each machine. You a story to tell there.

Ha, that's for sure. Each one of these boat anchors represents at least one trip, getting stuck, breaking down, meeting strange people, etc....

I've spent way too much time in the cab of an old truck with out A/C, out moving junk, cherished memories for sure. Those truck cab conversations were always the best.

A video probably wouldn't be much good, I'm not much of a story teller unfortunately.
 
Once some of the farm equipment was out of the way, what you've seen so far is only a small percentage unfortunately....

I started to move machine tools into the shop.

The first one to come in was the 1904 30x168 L&S. Got the forklift stuck up the front axle trying to move it by myself. Called Mark and between me on the 930 and him on the Hyster we were able to get out.

Everyone thought I was crazy for wanting a 25' door (wish I'd gone with 30' now), but it sure was nice to drive a forklift with a 20' long lathe right thought the door.

Granted I couldn't find anyone that wanted to build door like this, so I had to live with no doors until I could do them myself. Of course it took WAY to long to build the doors, but even a roof with open end walls and a concrete floor was nicer than dirt and tarps.
fa5b5fd5c92757e1d3f65a7c0bed4f5a.jpg
251b23d948d060c5da51fddce820e9b2.jpg
fddf04de1a9e61128be2ce5e1eaa1485.jpg
a8fcc848457cf8c30584ab400eb10578.jpg
270fb4386e1573c76760ac8b6db9ca2e.jpg
9a074a5ad52f42804d541b6638740619.jpg
1c9057327e1ba3c0b5ea8373e109a70c.jpg
098162400ea822df7b554da8314351e7.jpg
28cb333016d0f118d3d7b55aa77ef521.jpg
5b139ba5c57182a9df79d8d83a73e294.jpg
 
Looks like your power comes in next to the local phone exchange network node. That could be handy.

Seems like the plan is to lay high speed internet out here, I think that's what that knock out is (if were looking at the same thing). That's at-least what the guys running those lines said they were laying.
 
Next to come in was the 1920 40x294 Hendey.

Also moved the 1954 K&T 5CK in, but didn't grab any pictures of that.

The old L&S, the K&T and Hendey were all moved in on one day, 45,180 lbs just in those 3 machines, it was a BUSY day.

218b32c363ef19187eb01198023753c4.jpg
d3eaf9b8e7201e8d10584ae64ac234ca.jpg
82248747d37b93a84471f192cc6997b6.jpg
99fe3014ea068dd2e0dac6694bee00c6.jpg
c41eba64920b8b67f6a65fcfe10bd2ad.jpg
c5f1aafd65dab1f9a78a39aaa05df995.jpg
7849e948babee1b9a9ca7253cdf924cf.jpg
 








 
Back
Top