Captdave
Titanium
- Joined
- Sep 24, 2006
- Location
- Atlanta, GA
Since the weather has got cooler we have been having an issue with the tool changer hanging up on the first tool change of the morning. The shop heat is set to 50* overnight then warms up to 60* by 7Am.
After the warmup cycle the first tool change the swing are rotates about half way and stops. We manually MDI through the tool change and then its ready to go, once in awhile we'll have to do two manual cycles but not often. It doesn't matter which tool or pot is first up so I don't think its tool related.
Just curious if anyone else has run into this and if so what you did to remedy it?
TIA
After the warmup cycle the first tool change the swing are rotates about half way and stops. We manually MDI through the tool change and then its ready to go, once in awhile we'll have to do two manual cycles but not often. It doesn't matter which tool or pot is first up so I don't think its tool related.
Just curious if anyone else has run into this and if so what you did to remedy it?
TIA