Search Results - Practical Machinist - Largest Manufacturing Technology Forum on the Web
Close
Login to Your Account

Search:

Type: Posts; User: HiNi

Page 1 of 12 1 2 3 4

Search: Search took 0.00 seconds.

  1. Replies
    11
    Views
    1,538

    Thank you. Wouldn't ya know on backorder till...

    Thank you.
    Wouldn't ya know on backorder till December :)
  2. Thread: CMM Fixturing

    by HiNi
    Replies
    3
    Views
    1,046

    We farm out our CMM fixtures that have run sized...

    We farm out our CMM fixtures that have run sized from 1/2" x 2" up to 19" x 19" base size.
  3. Replies
    11
    Views
    1,538

    Yes, please I would be interested in the 2mm...

    Yes, please I would be interested in the 2mm rated vinyl cutting machine. Thank you.
    Also, yes, must be serialized numbers.
  4. Replies
    11
    Views
    1,538

    Thanks for the replies, had spoken with several...

    Thanks for the replies, had spoken with several inkjet distributors, our customer will not agree to the inkjet ink spec. The engineer who selected the current ink and catalyst called for in the...
  5. Replies
    11
    Views
    1,538

    Part marking method

    A customer's part marking is with a specific ink and catalyst, only.
    Markings have 4 lines of text with up to 16 numbers per line.
    For awhile we were using individual 3/16" rubber stamps and...
  6. Replies
    0
    Views
    815

    Linear Vertical Lift material storage unit.

    Does anyone have any experience with vertical lift material storage units?

    We are planning a building expansion, may years ago I saw a system at a Molex facility that stored molds and dies, it...
  7. Replies
    37
    Views
    6,280

    "For investigations that didn't proceed": here is...

    "For investigations that didn't proceed": here is some experience with cobot sales associates, I contacted the "first" sales guy who is employed directly with Universal Robot the manufacture, I asked...
  8. Replies
    17
    Views
    2,979

    Maybe you need to define an "area" for us. ...

    Maybe you need to define an "area" for us.
    Typically we're way less corporate than your questions and more entrepreneurial: does it solve a problem, how quick is the ROI.
  9. Replies
    74
    Views
    30,437

    We will have the first robot in place by...

    We will have the first robot in place by mid-August, not for tending a machine but to applying a product similar to a thread locker. The application guy is worn out when he finishes now, we joke with...
  10. Replies
    17
    Views
    2,782

    All you can do, is all you can do.

    All you can do, is all you can do.
  11. Replies
    0
    Views
    513

    17-4Ph Cond A. Round bar

    1.75" Dia x 72" L, 17-4Ph Condition A, imported with original factory certs.
    $15.50 per ft


    1.625" Dia x 144" L, 17-4Ph Condition A, imported with original factory certs.
    $12.50 per ft.

    ...
  12. Replies
    17
    Views
    2,037

    You may can find off the shelf using these search...

    You may can find off the shelf using these search terms:
    Stainless Steel Double Adjuster
    Left-Hand to Right-Hand Male Thread Adapters
    Connecting Rods
    Turnbuckle-Style Connecting Rods
  13. Replies
    0
    Views
    437

    Looking for an anodize job shop for "Blue G"

    Our anodizer quoted Blue anodize not the Blue G per the print specification.
    We are in need of a anodize shop with capabilities to apply Blue G anodize, per mil-spec.

    Contacted directly the...
  14. Replies
    1
    Views
    926

    Check your messages, if you do not see one from...

    Check your messages, if you do not see one from me, let me know.
  15. Fuelie, Unfortunately what your asking for is...

    Fuelie,
    Unfortunately what your asking for is way more expensive than anything commercially produced in volume by 100X.
    If your brother has access to a lathe, even if it isn't a high rpm one, that...
  16. Replies
    4
    Views
    603

    Poll: Cutting threads to CAD drawing

    Maybe I am behind the times and just did not know it.
    The senior engineer of a $5M+ job shop company told me they cut threads to the CAD model, remember these are customer CAD models, not generated...
  17. Replies
    1
    Views
    1,869

    Search TVA's Power Service Shops, that would be...

    Search TVA's Power Service Shops, that would be your best long term, good paying job in the area. You may need a degree or certificate, start as a landscaper/janitor whatever if you have to just hire...
  18. Sent you an email Wednesday.

    Sent you an email Wednesday.
  19. That is great, Thank you CNC Machines for...

    That is great, Thank you CNC Machines for stepping up with this offer.

    I hope you receive lots of requests.
  20. Replies
    2
    Views
    1,128

    check your email.

    check your email.
  21. Replies
    6
    Views
    1,163

    PM sent, please log in and check you inbox.

    PM sent, please log in and check you inbox.
  22. Replies
    5
    Views
    1,539

    PM'ed and email you on 9/11 with company name and...

    PM'ed and email you on 9/11 with company name and company email address.
  23. Replies
    7
    Views
    1,501

    PM has been sent

    PM has been sent
  24. Replies
    5
    Views
    1,036

    PM sent to you

    PM sent to you
  25. Replies
    2
    Views
    1,253

    P.M. Sent, we do micromachining.

    P.M. Sent, we do micromachining.
Results 1 to 25 of 296
Page 1 of 12 1 2 3 4