Search Results - Practical Machinist - Largest Manufacturing Technology Forum on the Web
Close
Login to Your Account

Search:

Type: Posts; User: sfriedberg

Search: Search took 0.02 seconds.

  1. Replies
    39
    Views
    8,491

    It was said above, but I'll repeat it as well as...

    It was said above, but I'll repeat it as well as "like" it. As a general rule, 10 days after pouring concrete is nowhere near long enough to be rolling multi-ton point loads around on the surface.
Results 1 to 1 of 1