Search Results - Practical Machinist - Largest Manufacturing Technology Forum on the Web
Close
Login to Your Account

Search:

Type: Posts; User: thermite

Search: Search took 0.03 seconds.

  1. As said, and more than once, it is a sane system...

    As said, and more than once, it is a sane system we could only WISH had been adopted, lower-48 as often as 120-208 // 240-416 Wye was on MIL gen sets.

    ONE extra conductor, TRIPLE the number of...
  2. Keeping in mind that Europe - UK with less War...

    Keeping in mind that Europe - UK with less War Two damage especially - doesn't tear-down and rebuild as often as the USA, "last few meters" are older, on average, so not all that commonly INTO the...
  3. "Simple like" a condo is a legal term to do with...

    "Simple like" a condo is a legal term to do with ownership, not a technical term, so it is not clear if you are talking a residence, office, or row of industrial spaces?

    A hotel, office building,...
  4. Can I help it I'm congenitally patient? We...

    Can I help it I'm congenitally patient?

    We shall just have to keep doing this until you get it right!

    Or they fix the PM search function so folk actually TRY to use it?

    Or - perish the very...
  5. I submit that you mean single-phase or "split...

    I submit that you mean single-phase or "split phase", centre-tap to Neutral, also Earthed at the entrance (only). That's North American & Japanese practice, mostly. Europe et al work directly off two...
  6. I think you meant "208 Wye 3-Phase", as...

    I think you meant "208 Wye 3-Phase", as for-damned sure Dominion VA Power has been reliable on 246 VAC single-phase for Donkey's Years, here.

    Powerco's can engineer whatever a customer has...
Results 1 to 6 of 6