    Default Another New Machine Day—it's not ALL doom and gloom...

    Haas #9 arrived this morning. The riggers spent only one hour getting it off the truck and bringing it in. Air lifts, articulated skates—pretty good crew. The changer holds 30 tools (not that we've ever made anything requiring that many tools but that's how they come now). HFO's installation guy comes next Thursday to wipe of the cosmo, level it, etc. The "In place" pic shows it across the aisle from a VF-0 installed in 1998 which is still in daily use, a good adverstisement for Haas mills, if they wanted you to keep old ones running—which of course they do not because that doesn't fund Gene's F1 team...

    On the well-worn subject of our economy: I just can't see any effects of the Wu Flu on our market segment, which is motorsport (I guess when people can't go out and race they employ their creativity building new race cars). Since September we have installed three new CNCs and four conventional gear hobbers, which rivals our most acquisitive year. Making stuff would seem to be a more secure occupation than many would've predicted.
    Attached Thumbnails Attached Thumbnails 1.-picking-off-truck.jpg   2.-both-axles-steer.jpg   3.-coming-door.jpg   4.-place.jpg  

  2. #2
    Join Date
    Oct 2009
    Location
    Oregon
    Posts
    4,967
    Post Thanks / Like
    Likes (Given)
    5386
    Likes (Received)
    2547

    Default

    That's a lot of similar machines!

    Are any of your mills pallet changing? Why not make the small step to a HMC?

  3. #3
    Join Date
    Sep 2017
    Country
    UNITED STATES
    State/Province
    Wisconsin
    Posts
    1,000
    Post Thanks / Like
    Likes (Given)
    232
    Likes (Received)
    641

    Default

    Man I love that electrical setup! I know it is pricey but I saw it in several buildings I looked at before I found my new shop.

  4. Likes Oldwrench liked this post
  5. #4
    Join Date
    Dec 2009
    Location
    Australia
    Posts
    45
    Post Thanks / Like
    Likes (Given)
    0
    Likes (Received)
    7

    Default

    Yeah we're getting the same doom and gloom thing here down under.

    A good, well run crew makes all the difference... no matter what the racket is.

    As long as your custs still have the green to keep paying and the confidence to proceed with "busin as usual" - happy days.

    Me- after a couple of weeks earlier on in the year when enquiries dropped a bit when this crap first hit....gave me a chance to almost catch up... it really hasnt stopped. Just had one of my busiest Julys and doesnt look like stopping from as far as I can see. Govt here seems to keep constantly changing the rules, but apart from getting interstate jobs back to their owners, been able to cope ok thus far.

  6. Likes Oldwrench liked this post
  7. #5
    Join Date
    May 2009
    Country
    UNITED STATES
    State/Province
    Wyoming
    Posts
    3,444
    Post Thanks / Like
    Likes (Given)
    8490
    Likes (Received)
    5579

    Default

    Quote Originally Posted by Garwood View Post
    That's a lot of similar machines!

    Are any of your mills pallet changing? Why not make the small step to a HMC?
    Parallel processing. First op goes in one machine, second op in another. After the first part is finished the TOTAL elapsed time is reduced to that of the longer of the two ops plus the transfer time between them. If you have six vise cavities the cycle time allows transfer, blowoff, in-process inspection, etc. at a non-sweating operator pace. In some cases we'll have a train of four or five machines running different steps on one part simultaneously with one operator, which cuts the actual elapsed time to a third or a quarter of what can be done by the one-and-done method.

  8. Likes Red James, Ox, Garwood liked this post
  9. #6
    Join Date
    May 2009
    Country
    UNITED STATES
    State/Province
    Wyoming
    Posts
    3,444
    Post Thanks / Like
    Likes (Given)
    8490
    Likes (Received)
    5579

    Default

    Quote Originally Posted by Rick Finsta View Post
    Man I love that electrical setup! I know it is pricey but I saw it in several buildings I looked at before I found my new shop.
    We got unbelievably lucky. The building had been a welding school during the 1970s oil boom and it had the Square D 480V busways with a total of 38 100A disconnect boxes. At that time the electric system was probably worth more than the building. I got it written into the contract that the busways etc were to stay. Otherwise it would've been many hours up on ladders running conduit.

    If you were referring to the LED lamps, they are finally competitive pricewise with fluorescents, and you can reuse your fixtures and eliminate the ballasts.

  10. #7
    Join Date
    Sep 2017
    Country
    UNITED STATES
    State/Province
    Wisconsin
    Posts
    1,000
    Post Thanks / Like
    Likes (Given)
    232
    Likes (Received)
    641

    Default

    Yup, talking about the bus bars!

    I've got LEDs going in here - I can't imagine putting anything else in these days.