Trboatworks
Diamond
- Joined
- Oct 23, 2010
- Location
- Maryland- USA
Engineer who has a special project going with a thousand changes evolving all the time- I have tried to pin him down and still facing re-do's and general too much fussing around.
He comes in the shop to let me know something was not right as I had to do some cuts and went with templates he provided not the actual parts.
Well more work is needed- not a big deal to rework but boy I laid it out that this is why I said I needed all the plans finalized and relevant equipment on site before work begins.
He turned tail and got out of the shop in a flash.
Sucks- I didn't even think- it just crossed a line and I spelled it out.
Now I need to apologize to the guy for crossing the line and just keep keeping on till the work is done.
And its a damn subcontract so I had to go explain to the general that I snapped at their client and why.
Some jobs- Whew.
Seems I am getting less willing or able to just roll with it.
Ok- that's all.
He comes in the shop to let me know something was not right as I had to do some cuts and went with templates he provided not the actual parts.
Well more work is needed- not a big deal to rework but boy I laid it out that this is why I said I needed all the plans finalized and relevant equipment on site before work begins.
He turned tail and got out of the shop in a flash.
Sucks- I didn't even think- it just crossed a line and I spelled it out.
Now I need to apologize to the guy for crossing the line and just keep keeping on till the work is done.
And its a damn subcontract so I had to go explain to the general that I snapped at their client and why.
Some jobs- Whew.
Seems I am getting less willing or able to just roll with it.
Ok- that's all.