    Default What's your $shop rate$ these days?

    Just curious on where shop rates are these days.
    I'm at $75 base rate, mostly manual machining, small quantities. Includes some design and repair work as well. A bit of Fab and welding too. Mostly anything interesting I can make my rate (or better) on. I'm trying to get an idea if that's an average for a small 1-2 man shop in the north east. But it'd be interesting to hear from others in other parts of the US as well. Have you managed to raise your rate in the last 5 years, or have you had to lower it? Or has it been the same for ? years?

  2. Likes DouglasJRizzo, SPDTool, Cismontguy liked this post
  3. #2
    Join Date
    Apr 2019
    Country
    UNITED STATES
    State/Province
    Arkansas
    Posts
    359
    Post Thanks / Like
    Likes (Given)
    49
    Likes (Received)
    159

    Default

    $300 an hour here.

  4. #3
    Join Date
    Nov 2018
    Country
    UNITED STATES
    State/Province
    Minnesota
    Posts
    19
    Post Thanks / Like
    Likes (Given)
    25
    Likes (Received)
    4

    Default

    Quote Originally Posted by as9100d View Post
    $300 an hour here.
    What kind of gated community is your shop in?
    85 to 100 depending on the job. Cnc one offs,manual, engine machining, crankshafts, blocks, heads and cams mostly big diesel not pickups. The Napa stores keep the engine crap down still charging 1975 prices using 1965 equipment that’s shot. Just need to make shire at the end of the day the hrs go to a job, all hrs setup till cleanup is finished.


    Sent from my iPhone using Tapatalk

  5. #4
    Join Date
    Apr 2019
    Country
    UNITED STATES
    State/Province
    Arkansas
    Posts
    359
    Post Thanks / Like
    Likes (Given)
    49
    Likes (Received)
    159

    Default

    Quote Originally Posted by Turbowerks View Post
    What kind of gated community is your shop in?
    85 to 100 depending on the job. Cnc one offs,manual, engine machining, crankshafts, blocks, heads and cams mostly big diesel not pickups. The Napa stores keep the engine crap down still charging 1975 prices using 1965 equipment that’s shot. Just need to make shire at the end of the day the hrs go to a job, all hrs setup till cleanup is finished.


    Sent from my iPhone using Tapatalk
    Aerospace and DOD work. Don't worry, my margins are probably 1% of what yours are.

  6. #5
    Join Date
    Jan 2019
    Country
    UNITED STATES
    State/Province
    Tennessee
    Posts
    455
    Post Thanks / Like
    Likes (Given)
    139
    Likes (Received)
    120

    Default

    65/hr structural and misc fabrication. Our last two bigger jobs at 60/hr.

  7. #6
    Join Date
    Mar 2011
    Country
    SWITZERLAND
    Posts
    1,000
    Post Thanks / Like
    Likes (Given)
    122
    Likes (Received)
    406

    Default

    I take CHF 90 per hour. Specialised work costs more.

  8. #7
    Join Date
    Sep 2015
    Country
    UNITED STATES
    State/Province
    California
    Posts
    431
    Post Thanks / Like
    Likes (Given)
    22
    Likes (Received)
    180

    Default

    I’ve seen shop rates anywhere from $85/hr to $140/hr. I’m at $89 for now. But as California, in it’s infinite wisdom, has decided to jack minimum wage to $15/hr within the next couple years, I am going to have to adjust that soon.

  9. #8
    Join Date
    Mar 2014
    Location
    United States
    Posts
    50
    Post Thanks / Like
    Likes (Given)
    30
    Likes (Received)
    22

    Default

    I tell customers I'm at $65/hr.

    But recently on my quote spreadsheet I've been using $75-85/hr.

  10. Likes gustafson, Ox, wheelieking71, barbter liked this post
  11. #9
    Join Date
    Sep 2017
    Country
    UNITED STATES
    State/Province
    South Carolina
    Posts
    474
    Post Thanks / Like
    Likes (Given)
    362
    Likes (Received)
    392

    Default

    Quote Originally Posted by WA-CNC View Post
    I tell customers I'm at $65/hr.

    But recently on my quote spreadsheet I've been using $75-85/hr.
    Great way to build customer relationships. Lying always helps.
    Hourly rates don't mean a thing. It's the final price that counts. I have never used a spreadsheet to quote.

  12. #10
    Join Date
    Mar 2006
    Country
    PHILIPPINES
    Posts
    2,425
    Post Thanks / Like
    Likes (Given)
    521
    Likes (Received)
    755

    Default

    In the China shop it's $30 per hour for 3+1 axis work and $40 for 5X.

    In the Subic shop it's $40 for 3+1 and $45 for 5X.

  13. #11
    Join Date
    Mar 2006
    Country
    PHILIPPINES
    Posts
    2,425
    Post Thanks / Like
    Likes (Given)
    521
    Likes (Received)
    755

    Default

    Quote Originally Posted by crazygoat View Post
    Great way to build customer relationships. Lying always helps.
    Hourly rates don't mean a thing. It's the final price that counts. I have never used a spreadsheet to quote.

    WOW, What are you using to quote with? I've been using Spreadsheet since the late 80's. I did try E2 and Job-boss but just can't get enough info out of them like excel.

  14. Likes barbter liked this post
  15. #12
    Join Date
    Sep 2017
    Country
    UNITED STATES
    State/Province
    South Carolina
    Posts
    474
    Post Thanks / Like
    Likes (Given)
    362
    Likes (Received)
    392

    Default

    Quote Originally Posted by g-coder05 View Post
    WOW, What are you using to quote with? I've been using Spreadsheet since the late 80's. I did try E2 and Job-boss but just can't get enough info out of them like excel.
    Old fashion pencil and paper. And a good eraser!

  16. #13
    Join Date
    Dec 2016
    Country
    UNITED STATES
    State/Province
    Kentucky
    Posts
    208
    Post Thanks / Like
    Likes (Given)
    34
    Likes (Received)
    70

    Default

    Equipment repair is my main thing but do some machining. All manual stuff. Bushings, weld build up ect. mostly for the repairs im already doing. Fab work and welding. Steady at 80 fixin to go up. everyone i. work for is real happy so either the work is real good or the price is alright. Either way i feel im going to 90 soon.

  17. #14
    Join Date
    Apr 2005
    Location
    Beaverdam, Virginia
    Posts
    7,342
    Post Thanks / Like
    Likes (Given)
    639
    Likes (Received)
    3456

    Default

    $40-$200 an hour. Depends on degree of difficulty and how well my machinery and knowledge fit the job. That is mostly all CNC Lathe or Swiss work. $40 an hour is for short overall length jobs out of easy to machine material where a 12 foot bar lasts 3+ hours, tooling lasts forever, and you can run all day without making an offset. $200 an hour is for things like parts that have multiple +/-.0003 diameters on them 50x diameter holes out of 304 SS where I get handcuffed to the machine, parts a lot of shops won't take on or have quality issues.

  18. Likes Ox, wheelieking71, Garwood, Bobw liked this post
  19. #15
    Join Date
    Jan 2013
    Location
    Gilbert, AZ
    Posts
    5,813
    Post Thanks / Like
    Likes (Given)
    7292
    Likes (Received)
    7409

    Default

    $75-$105/hr (machine dependent), programming/set-up $85/hr.
    I do not mark pre-cut material up, I try to order everything cut.
    But, if it has to go on the saw? It gets marked up 20%.

    Everything is subject to the PITA-factor!

  20. #16
    Join Date
    Jan 2007
    Country
    UNITED STATES
    State/Province
    Florida
    Posts
    1,110
    Post Thanks / Like
    Likes (Given)
    133
    Likes (Received)
    404

    Default

    Quote Originally Posted by wheelieking71 View Post
    $75-$105/hr (machine dependent), programming/set-up $85/hr.
    I do not mark pre-cut material up, I try to order everything cut.
    But, if it has to go on the saw? It gets marked up 20%.

    Everything is subject to the PITA-factor!
    if you have to order, pay for, unload material i don't see why all of it isn't marked up.
    how do you calculate 20%? material cost * 1.2? better way is material cost /0.8

  21. #17
    Join Date
    Jul 2011
    Country
    UNITED STATES
    State/Province
    Utah
    Posts
    907
    Post Thanks / Like
    Likes (Given)
    1923
    Likes (Received)
    356

    Default

    Only $35 here, but that is in addition to regular pay from day job. (Hours concurrent). Mostly repair of rebar benders, shears, forklifts, and custom work for owner & owner’s relatives.
    Many mods on machines and forklifts, and of course they have to look pretty when finished!

  22. #18
    Join Date
    Mar 2014
    Location
    United States
    Posts
    50
    Post Thanks / Like
    Likes (Given)
    30
    Likes (Received)
    22

    Default

    Quote Originally Posted by crazygoat View Post
    Great way to build customer relationships. Lying always helps.
    Hourly rates don't mean a thing. It's the final price that counts. I have never used a spreadsheet to quote.
    Whatever.

    My rates are entirely my own business. I tell them $65/hour as that's an attractive value for most of my customers. I've had the same customers for 10 years, their not fixated on my rate, more on delivery and quality, despite a few hiccups has been acceptable.

  23. Likes barbter liked this post
  24. #19
    Join Date
    Mar 2014
    Location
    United States
    Posts
    50
    Post Thanks / Like
    Likes (Given)
    30
    Likes (Received)
    22

    Default

    Quote Originally Posted by g-coder05 View Post
    In the China shop it's $30 per hour for 3+1 axis work and $40 for 5X.

    In the Subic shop it's $40 for 3+1 and $45 for 5X.
    I've been loosing a customers work to a Chinese shop.

    In the latest round of work I bid everything at $75/hour, somehow I came in 12% cheaper and got the job. that was straight up, no fudging the hours, 20% material markup. I quoted the time as close as I could.

    Either they (the Chinese) got complacent and increased their prices thinking they had a lock on the work. Or I f'd up. I'll know in a week or two.

  25. Likes Bobw, Ox liked this post
  26. #20
    Join Date
    Jan 2016
    Country
    UNITED STATES
    State/Province
    New Jersey
    Posts
    216
    Post Thanks / Like
    Likes (Given)
    66
    Likes (Received)
    95

    Default

    Why would you tell your customer your shop rate at all? I certainly don't think disclosing that your rates are going up is required, either. I've never asked a vendor what their shop rate is or given it to a customer, and I would politely decline the opportunity to do so if asked. I'm not a lawyer, I'm not billing them based on hours, I'm billing them based on delivering the product.

  27. Likes PDW, machinistrrt liked this post

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •