    Default which phase is less expensive to use

    Is it less expensive to install 3phase, or use a phase inverter. I can get 3 Phase installed for $1000.00.

  2. #2
    Join Date
    Jun 2012
    Location
    Davis Junction, Illinois
    Posts
    303
    Post Thanks / Like
    Likes (Given)
    143
    Likes (Received)
    101

    Default

    My shop power cost went down moving from my garage to the building with 3 phase. But, I run outside the times that are used to calculate demand charge. Around here ComEd uses 9AM-6PM M-F.
    No matter the cost, get the real 3 phase. Its so nice.

  3. Likes Pete Deal, steve-l liked this post
  4. #3
    Join Date
    Nov 2006
    Location
    Camarillo Ca
    Posts
    535
    Post Thanks / Like
    Likes (Given)
    44
    Likes (Received)
    124

    Default

    For $1000.00 That is no decision at all. Get it. Be sure you ask about demand charges and Minimums. Go in with your eyes open.

  5. Likes BT Fabrication liked this post
  6. #4
    Join Date
    Dec 2015
    Country
    UNITED STATES
    State/Province
    Connecticut
    Posts
    1,387
    Post Thanks / Like
    Likes (Given)
    32
    Likes (Received)
    469

    Default

    I’m curious to know how you get real three phase for a grand?


    Sent from my iPhone using Tapatalk Pro

  7. Likes BT Fabrication liked this post
  8. #5
    Join Date
    Jul 2007
    Location
    Missoula Mt
    Posts
    1,398
    Post Thanks / Like
    Likes (Given)
    62
    Likes (Received)
    674

    Default

    It will not be full 3 phase , it will be open delta. With the demand meter the single phase with a vfd or rfc will be cheaper in the long run for loads under 15 hp...Phil

  9. #6
    Join Date
    Nov 2004
    Location
    Webster Groves, MO
    Posts
    7,987
    Post Thanks / Like
    Likes (Given)
    2077
    Likes (Received)
    3906

    Default

    Quote Originally Posted by Phil in Montana View Post
    It will not be full 3 phase , it will be open delta. With the demand meter the single phase with a vfd or rfc will be cheaper in the long run for loads under 15 hp...Phil
    Around here Ameren charges the same per kilowatt hour for both. In generating the third phase consumes energy so it cannot be less per CW hour delivered at the machine. A demand meter may alter that a bit, but the real stuff is so much better that there is no comparison. Most phase converters suffer from the same problem- they change output voltage and phase angle with varying loads, so the machines are rarely getting optimum power.

    Open delta is the same AC as the other types, just missing a separate ground.

    Bill

  10. Likes Strostkovy liked this post
  11. #7
    Join Date
    Jul 2007
    Location
    Missoula Mt
    Posts
    1,398
    Post Thanks / Like
    Likes (Given)
    62
    Likes (Received)
    674

    Default

    "Open delta is the same AC as the other types, just missing a separate ground."


    ???... open delta has a ground between l1 and l2.. with a 12$ demand charge for 3 phase and no demand charge for 1 phase its a no brainer.....Phil

  12. #8
    Join Date
    Nov 2004
    Location
    Webster Groves, MO
    Posts
    7,987
    Post Thanks / Like
    Likes (Given)
    2077
    Likes (Received)
    3906

    Default

    Quote Originally Posted by Phil in Montana View Post
    "Open delta is the same AC as the other types, just missing a separate ground."


    ???... open delta has a ground between l1 and l2.. with a 12$ demand charge for 3 phase and no demand charge for 1 phase its a no brainer.....Phil
    The operative word is "separate.

    Bill

  13. #9
    Join Date
    Mar 2009
    Country
    UNITED STATES
    State/Province
    California
    Posts
    6,155
    Post Thanks / Like
    Likes (Given)
    116
    Likes (Received)
    1204

    Default

    Quote Originally Posted by Wolftrio3 View Post
    Is it less expensive to install 3phase, or use a phase inverter. I can get 3 Phase installed for $1000.00.
    If you definitely do not want to deal with electrical power generation issues then get the install.

    Not sure what your needs are but you could probably build a nice phase converter for that much money.

  14. #10
    Join Date
    Nov 2004
    Location
    Webster Groves, MO
    Posts
    7,987
    Post Thanks / Like
    Likes (Given)
    2077
    Likes (Received)
    3906

    Default

    Quote Originally Posted by rons View Post
    If you definitely do not want to deal with electrical power generation issues then get the install.

    Not sure what your needs are but you could probably build a nice phase converter for that much money.
    Having run for several years on a commercial converter, Rotophase, and done some investigation, I don't know of a converter that replaces the real thing. Most of the static and rotary units can be tuned for one load but will be off the voltage or phase angle in the generated phase. Most converters are like sex in a car. You can do it, but there are lots of better ways.

    Bill

  15. Likes Strostkovy, DaveKamp liked this post
  16. #11
    Join Date
    Oct 2005
    Country
    UNITED STATES
    State/Province
    Pennsylvania
    Posts
    22,051
    Post Thanks / Like

    Default

    "which phase is less expensive to use ?"
    "c" phase....Because "a" and "b" are closer to the top.....:d

  17. #12
    Join Date
    Aug 2004
    Country
    UNITED STATES
    State/Province
    California
    Posts
    2,793
    Post Thanks / Like
    Likes (Given)
    30
    Likes (Received)
    694

    Default

    If you don't understand the references to "Demand Charges", commercial and industrial users are charged a separate amount for what the Utility must keep in reserve to handle your demands during peak operations. So they add another meter called a "Demand Meter" that is like a ratcheting meter in that it registers the peak amount you demanded from them during the month and doesn't go back down, and that then triggers additional charges, usually as a multiplier on your kWh usage. Residential users don't get that separate meter, unless you go to a 3 phase service.

    So they might be quoting you a low number as the one-time charge to drop the 3rd phase to your facility because there is already 3 phase on the pole, but the hidden "gotcha" is that they will add that new meter and get a chunk of flesh from you every month.

  18. #13
    Join Date
    Jul 2007
    Location
    Missoula Mt
    Posts
    1,398
    Post Thanks / Like
    Likes (Given)
    62
    Likes (Received)
    674

    Default

    Demand is like bonanzas points on a pin ball machine, My shops bill is $400 for usage and $900 for demand...Phil