carl laniak
Aluminum
- Joined
- Dec 27, 2012
- Location
- South Carolina, United States
I am running an old Leadwell MCV 760, with Fanuc 0-M control.
I can't figure out the search terms to find the answer for this...
I am drilling a bunch of holes that need a full retract between pecks.
These holes are 0.77" deep, and I'm pecking 0.1" at a time.
My issue is that when the drill re-enters the hole it only rapids to within 0.1" of the bottom of the hole before slowing to the drilling feed rate.
I'd like it to rapid to say, within 0.015" before slowing to the drilling feed rate.
Is there a canned cycle with a variable for this?
If not, I guess it's time to spend some time learning to write a macro for the purpose.
Perhaps there is a parameter in the control that decides what percentage of the peck depth the drill returns to after full retract....?
Thanks,
Carl
I can't figure out the search terms to find the answer for this...
I am drilling a bunch of holes that need a full retract between pecks.
These holes are 0.77" deep, and I'm pecking 0.1" at a time.
My issue is that when the drill re-enters the hole it only rapids to within 0.1" of the bottom of the hole before slowing to the drilling feed rate.
I'd like it to rapid to say, within 0.015" before slowing to the drilling feed rate.
Is there a canned cycle with a variable for this?
If not, I guess it's time to spend some time learning to write a macro for the purpose.
Perhaps there is a parameter in the control that decides what percentage of the peck depth the drill returns to after full retract....?
Thanks,
Carl