texasgeartrain
Titanium
- Joined
- Feb 23, 2016
- Location
- Houston, TX
With moving the clutch bevel gears in qcgb 180 degrees out, I cut a new key slot in the through rod for clutch on the rear side, where lever assembly mounts.
Because I'm relatively close to the wall on rear side, I wanted to stick the through rod in now, in case I don't need to remove qcgb again. The through rod can not enter through the front of lathe. You can see it shoved part way in here:

Whether removing or installing qcgb, the through rod need to be pushed at least flush with bed to avoid interference while moving qcgb:

If you have limited room on rear side, and forget to install the rod, you can remove a cover and a bearing for the rod which should give you room. Hard to see, but I drilled an oil hole for the bearing at 12 oclock:

I set qcgb on base, but I'm not totally in position yet. You can see the upper bearing flange on qcgb for lead screw. I need lead screw mounted before going all the way in:

Because I'm relatively close to the wall on rear side, I wanted to stick the through rod in now, in case I don't need to remove qcgb again. The through rod can not enter through the front of lathe. You can see it shoved part way in here:

Whether removing or installing qcgb, the through rod need to be pushed at least flush with bed to avoid interference while moving qcgb:

If you have limited room on rear side, and forget to install the rod, you can remove a cover and a bearing for the rod which should give you room. Hard to see, but I drilled an oil hole for the bearing at 12 oclock:

I set qcgb on base, but I'm not totally in position yet. You can see the upper bearing flange on qcgb for lead screw. I need lead screw mounted before going all the way in:
